{"id":21534,"date":"2026-04-08T09:40:43","date_gmt":"2026-04-08T13:40:43","guid":{"rendered":"https:\/\/aecom.com\/blog\/?p=21534"},"modified":"2026-04-08T09:54:08","modified_gmt":"2026-04-08T13:54:08","slug":"people-spotlight-meet-mario-turgeon","status":"publish","type":"post","link":"https:\/\/aecom.com\/blog\/people-spotlight-meet-mario-turgeon\/","title":{"rendered":"People Spotlight: Meet Mario Turgeon"},"content":{"rendered":"\n<p>Our <a href=\"https:\/\/aecom.com\/blog\/tags\/people-spotlight\/\" target=\"_blank\" rel=\"noreferrer noopener\"><em>People Spotlight<\/em> series<\/a> gives you an inside look at our technical experts around the world. This week, we are highlighting a hydraulic turbine-generator specialist from our water business line in Canada and providing you insight into their inspiration and work.<\/p>\n\n\n\n<p>Mario Turgeon is a mechanical engineer specializing in hydraulic turbines and generators. With more than 32 years of experience \u2014 including over 18 at AECOM \u2014 he has contributed to a wide range of hydropower projects, including new developments and rehabilitation programs. His experience spans multiple turbine types and configurations, from small to large\u2011scale hydroelectric and pumped\u2011storage facilities, across projects in Canada, the United States, South America and Africa.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>Tell us about what inspired you to join the industry.<\/strong><\/p>\n\n\n\n<p>My first meaningful exposure to the hydropower industry came during a summer job after my first year at university. I worked as a tour guide at the Shawinigan 2 generating station, which was built in the early 20th century. At the time, it was the largest hydroelectric site in Quebec, earning it the nickname \u201cNiagara of the East\u201d. This summer job was a dream opportunity. It not only satisfied my curiosity about how turbine-generator units convert the potential energy of water into electricity but also sparked a lasting interest in the rich history of hydropower.<\/p>\n\n\n\n<p>Early in my career, I had the opportunity to join GE Hydro, one of the leading hydraulic turbine manufacturers, marking the beginning of what has become a lifelong career in hydropower. After working as a turbine design engineer and later as the turbine department technical lead, I joined RSW, an AECOM legacy company. This move allowed me to remain in the hydropower sector while gaining exposure to a broader range of project activities, developing a more holistic project perspective and collaborating more closely with clients and multidisciplinary teams.<\/p>\n\n\n\n<p>One thing I quickly realized is that every hydropower project is unique, not only shaped by its river hydrology and site conditions but also by the people involved. This is what makes the field so engaging: no matter how experienced you are, there is always something new to learn.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"aecom-custom-block client-quote-block\" style=\"margin-top: 0px; margin-bottom: 40px\">\n    <p class=\"client-quote-text\" style=\"margin-top: 30px\";>\n        One thing I quickly realized is that every hydropower project is unique, not only shaped by its river hydrology and site conditions but also by the people involved. This is what makes the field so engaging: no matter how experienced you are, there is always something new to learn.    <\/p>\n    <p class=\"client-quote-author\">\n            <\/p>\n    <p class=\"client-quote-title\">\n            <\/p>\n<\/div>\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>What is your favorite AECOM project that you\u2019ve worked on and why?<\/strong><em><\/em><\/p>\n\n\n\n<p>One of my favourite projects I\u2019ve worked on at AECOM is the Rusumo Hydropower Project, an 80-megawatt power station jointly owned by Rwanda, Tanzania and Burundi. I became involved in the project in 2014, beginning with the preparation of the design report and bidding documents. Over the following years, I contributed to all major phases of the project, including bid evaluation, turbine model testing, design reviews, follow-up on manufacturing, installation and ultimately unit commissioning. Being involved from early concept through commissioning made this a uniquely rewarding experience.<\/p>\n\n\n\n<p>The project also has strong personal significance for me. While studying mechanical engineering, I first came to Rwanda in the early 1990s as an intern, teaching computer science at the National University of Rwanda. During that time, frequent power outages were a constant challenge. I never would have imagined that more than 20 years later, I would play a direct role in developing a project that strengthens Rwanda\u2019s electricity supply and supports regional development. That full\u2011circle connection makes the Rusumo project especially meaningful to me.<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"aecom-custom-block client-quote-block\" style=\"margin-top: 0px; margin-bottom: 40px\">\n    <p class=\"client-quote-text\" style=\"margin-top: 30px\";>\n        I never would have imagined that more than 20 years later, I would play a direct role in developing a project that strengthens Rwanda\u2019s electricity supply and supports regional development.    <\/p>\n    <p class=\"client-quote-author\">\n            <\/p>\n    <p class=\"client-quote-title\">\n            <\/p>\n<\/div>\n\n\n<div style=\"height:23px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"21542\" src=\"https:\/\/aecom.com\/blog\/wp-content\/uploads\/2026\/04\/Rusomo-powerhouse-1-1024x768.jpg\" alt=\"\" class=\"wp-image-21542\" srcset=\"https:\/\/aecom.com\/blog\/wp-content\/uploads\/2026\/04\/Rusomo-powerhouse-1-1024x768.jpg 1024w, https:\/\/aecom.com\/blog\/wp-content\/uploads\/2026\/04\/Rusomo-powerhouse-1-300x225.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Rusumo &#8211; powerhouse<\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"21543\" src=\"https:\/\/aecom.com\/blog\/wp-content\/uploads\/2026\/04\/Rusomo-view-toward-tailrace-1024x768.jpg\" alt=\"\" class=\"wp-image-21543\" srcset=\"https:\/\/aecom.com\/blog\/wp-content\/uploads\/2026\/04\/Rusomo-view-toward-tailrace-1024x768.jpg 1024w, https:\/\/aecom.com\/blog\/wp-content\/uploads\/2026\/04\/Rusomo-view-toward-tailrace-300x225.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Rusumo &#8211; view toward tailrace<\/strong><\/figcaption><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Tell us a story of how your work positively impacted the community.<\/strong><em><\/em><\/p>\n\n\n\n<p>We recently completed the Jiji\u2013Mulembwe Hydropower Project in Burundi. The project consists of two run\u2011of\u2011river hydropower plants, inaugurated in 2025, with a combined installed capacity of 49.5&nbsp;megawatts. This single project increased Burundi\u2019s national electricity capacity by approximately 25 percent, significantly reducing the country\u2019s reliance on imported fossil fuels for power generation. The two plants play a critical role in improving grid reliability by delivering clean, renewable energy to communities, businesses and essential services. I was proud to participate in a project that directly supports Burundi\u2019s energy security and long\u2011term development.<\/p>\n\n\n\n<p>One of the aspects I valued most was collaborating with professionals from diverse cultural and technical backgrounds, all working toward the shared goal of delivering a key piece of infrastructure with lasting benefits for the population.<\/p>\n\n\n\n<div style=\"height:17px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"aecom-custom-block client-quote-block\" style=\"margin-top: 0px; margin-bottom: 40px\">\n    <p class=\"client-quote-text\" style=\"margin-top: 30px\";>\n        The two plants play a critical role in improving grid reliability by delivering clean, renewable energy to communities, businesses and essential services.    <\/p>\n    <p class=\"client-quote-author\">\n            <\/p>\n    <p class=\"client-quote-title\">\n            <\/p>\n<\/div>\n\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Share a piece of career advice.<\/strong> No hydropower project can be delivered by one person alone. Success depends on people with different skills working together toward a shared goal. Throughout my career, I\u2019ve learned that listening to others, sharing credit and supporting colleagues leads to better outcomes not only for the project but for everyone involved. When a team is aligned and working collaboratively, individual contributions have far greater impact, and it is this collective success that truly drives meaningful projects forward.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With more than 32 years of experience \ua7f7 including over 18 at AECOM \ua7f7 Mario has contributed to a wide range of hydropower projects, including new developments and rehabilitation programs.<\/p>\n","protected":false},"author":1134,"featured_media":21535,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[175,171],"tags":[228,6936,6007,6666,108],"yst_prominent_words":[335,458,2968,582,899,3972,367,706,635,5442,2143,659],"class_list":["post-21534","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-water","tag-energy","tag-hydraulic-turbines-and-generators","tag-people-spotlight","tag-renewable-energy","tag-water"],"acf":[],"_links":{"self":[{"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/posts\/21534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/users\/1134"}],"replies":[{"embeddable":true,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/comments?post=21534"}],"version-history":[{"count":6,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/posts\/21534\/revisions"}],"predecessor-version":[{"id":21545,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/posts\/21534\/revisions\/21545"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/media\/21535"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/media?parent=21534"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/categories?post=21534"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/tags?post=21534"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/aecom.com\/blog\/wp-json\/wp\/v2\/yst_prominent_words?post=21534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}