{"id":2752,"date":"2021-03-04T00:55:00","date_gmt":"2021-03-04T00:55:00","guid":{"rendered":"https:\/\/aecom.com\/en-ca\/?post_type=press-release&#038;p=2752"},"modified":"2023-12-03T01:10:23","modified_gmt":"2023-12-03T01:10:23","slug":"aecom-and-graham-construction-joint-venture-completes-design-build-work-on-the-first-wastewater-treatment-plant-in-greater-victoria-british-columbia-2","status":"publish","type":"press-release","link":"https:\/\/aecom.com\/en-ca\/press-releases\/aecom-and-graham-construction-joint-venture-completes-design-build-work-on-the-first-wastewater-treatment-plant-in-greater-victoria-british-columbia-2\/","title":{"rendered":"AECOM and Graham Construction joint venture completes design-build work on the first wastewater treatment plant in Greater Victoria, British Columbia"},"content":{"rendered":"\n<p><em><strong>The plant can treat 108 megalitres of wastewater per day to a tertiary level \u2013 one of the highest levels of treatment available<\/strong><\/em><\/p>\n\n\n\n<p><strong>Victoria, British Columbia<\/strong>\u00a0(March 4, 2021) \u2013 AECOM, the world\u2019s premier infrastructure consulting firm, and Graham Construction announced they have successfully completed the design-build work on the first wastewater treatment plant in Victoria, British Columbia. The McLoughlin Point Wastewater Treatment Plant provides tertiary treatment for wastewater from the core area municipalities of Victoria, Esquimalt, Saanich, Oak Bay, View Royal, Langford, and Colwood and the Esquimalt and Songhees Nations. Work at the facility began in 2017 by Harbour Resource Partners, a joint venture between AECOM and Graham. The plant is the main component of a CAD$775 million wastewater program undertaken by the Capital Regional District.<\/p>\n\n\n\n<p>\u201cWe\u2019re honoured to support the Capital Regional District in delivering this world-class wastewater treatment plant by bringing forward our industry leading resume of water and environmental solutions,\u201d said Marc Devlin, AECOM\u2019s regional chief executive, Canada. \u201cAECOM is committed to leading environmental, social, and governance best practices and making a positive impact on the communities we serve.\u201d<\/p>\n\n\n\n<p>The design-build partnership leveraged AECOM\u2019s wastewater design and environmental expertise and Graham\u2019s well-established competence in this sector of construction in Canada. Despite logistical challenges due to the COVID-19 pandemic, the project was successfully delivered on time, meeting federal and provincial regulations.<\/p>\n\n\n\n<p>\u201cThe successful construction of the McLoughlin Point Wastewater Treatment Plant marks the completion of the most complex wastewater project ever built in Western Canada,\u201d said Ian Dickinson, Graham\u2019s executive vice president overseeing the project. \u201cWe\u2019re incredibly proud of our multi-disciplined team of builders who applied Graham\u2019s extensive experience of wastewater construction to safely complete a wide range of construction challenges including a one kilometer hard rock directional drill across the outer harbour, a unique three level tertiary treatment plant perched on a rocky outcrop and a long sub-sea outfall into the Strait of Juan de Fuca.\u201d<\/p>\n\n\n\n<p>The project underwent extensive consultation with local Indigenous communities. Environmental work included acquisition of all permits and approvals required for construction. Leveraging the strength of the design-build team\u2019s technical excellence in large-scale, multi-phase water projects, the plant\u2019s relatively small footprint incorporates elements that promote sustainability and energy efficiency, including the construction of an operations and maintenance building, built to LEED Gold certification requirements, that utilizes heat recovery from within the facility. In addition, an education and interpretive space is featured on the second floor of the building to engage the community with the plant\u2019s water cycle, local natural environment, and the overall importance of stormwater management.<\/p>\n\n\n\n<p>The plant can treat 108 megalitres of wastewater per day to a tertiary level \u2013 one of the highest levels of treatment available \u2013 leading to cleaner ocean waters in and around the south coast of British Columbia and northern Washington state. Prior to the plant\u2019s opening, Victoria and its suburban municipalities would release all its wastewater into Juan de Fuca Strait, having just passed through screens.<\/p>\n\n\n\n<p><strong>About AECOM<\/strong><\/p>\n\n\n\n<p>AECOM is the world\u2019s premier infrastructure consulting firm, delivering professional services throughout the project lifecycle \u2013 from planning, design and engineering to program and construction management. On projects spanning transportation, buildings, water, energy and the environment, our public- and private-sector clients trust us to solve their most complex challenges. Our teams are driven by a common purpose to deliver a better world through our unrivaled technical expertise and innovation, a culture of equity, diversity and inclusion, and a commitment to environmental, social and governance priorities. AECOM is a Fortune 500 firm and its Professional Services business had revenue of $13.2 billion in fiscal year 2020. See how we deliver what others can only imagine at&nbsp;<a href=\"https:\/\/aecom.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">aecom.com<\/a>&nbsp;and @AECOM.<\/p>\n\n\n\n<p><strong>About Graham Construction<\/strong><\/p>\n\n\n\n<p>Graham is an employee-owned construction solutions partner with revenues exceeding $2 billion annually. With over nine decades of experience, Graham provides general contracting, design-build, integrated project delivery, construction management, public-private partnerships and development services in the buildings, industrial, infrastructure and project finance sectors. Graham has offices throughout North America and employs over 1,600 passionate professionals focused on delivering lasting value. Graham has the resources, capacity and expertise to undertake projects of every scope, scale and complexity. Visit us at&nbsp;<a href=\"https:\/\/www.grahambuilds.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">grahambuilds.com<\/a>&nbsp;to discover how we\u2019re building for a better tomorrow.<\/p>\n\n\n\n<p><strong>Media Contact:<\/strong><br>Rachel Weiss, Senior Communications Manager<br>(212) 708-6746<br><a href=\"mailto:rachel.weiss@aecom.com\" target=\"_blank\" rel=\"noreferrer noopener\">rachel.weiss@aecom.com<\/a><\/p>\n","protected":false},"featured_media":0,"template":"","yst_prominent_words":[],"class_list":["post-2752","press-release","type-press-release","status-publish","hentry"],"acf":[],"metadata":{"_locations":null,"_regions":["Americas"],"_markets":null,"_press_release_types":null},"_links":{"self":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release\/2752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release"}],"about":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/types\/press-release"}],"version-history":[{"count":1,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release\/2752\/revisions"}],"predecessor-version":[{"id":2753,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release\/2752\/revisions\/2753"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/media?parent=2752"}],"wp:term":[{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/yst_prominent_words?post=2752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}