{"id":3009,"date":"2023-10-18T12:43:52","date_gmt":"2023-10-18T12:43:52","guid":{"rendered":"https:\/\/aecom.com\/en-ca\/press-releases\/aecom-awarded-contract-to-serve-as-technical-advisor-for-hamilton-lrt-in-ontario-canada\/"},"modified":"2023-12-11T12:56:01","modified_gmt":"2023-12-11T12:56:01","slug":"aecom-awarded-contract-to-serve-as-technical-advisor-for-hamilton-lrt-in-ontario-canada","status":"publish","type":"press-release","link":"https:\/\/aecom.com\/en-ca\/press-releases\/aecom-awarded-contract-to-serve-as-technical-advisor-for-hamilton-lrt-in-ontario-canada\/","title":{"rendered":"AECOM awarded contract to serve as technical advisor for Hamilton LRT in Ontario, Canada"},"content":{"rendered":"\n<p><strong>DALLAS <\/strong>(October 18, 2023) \u2014 AECOM (NYSE: ACM), the world\u2019s trusted infrastructure consulting firm, today announced that it has been appointed by Metrolinx as technical advisor for the Hamilton Light Rail Transit project, a 14-kilometer transit line to be located within Hamilton, Ontario. The line will be the city\u2019s first light rail transit system and will be designed to accommodate expected future growth and development, improve connectivity and attract economic development in the rapidly growing area.<\/p>\n\n\n\n<p>\u201cAs Ontario advances its record investment in public transit, we look forward to working with Metrolinx and our partners to support a more connected and economically vibrant Hamilton through accessible and sustainable transportation,\u201d said Richard Barrett, chief executive of AECOM\u2019s Canada region. \u201cAECOM has played a critical role in light rail projects across Ontario and Canada, and our teams are excited to deploy their depth of experience and local expertise to deliver this transformative project.\u201d<\/p>\n\n\n\n<p>AECOM\u2019s integrated team will be supporting Metrolinx on the delivery of the full breadth of infrastructure for the Hamilton LRT.<\/p>\n\n\n\n<p>\u201cWorld-class transit is critical to urban development, especially as we seek to design more sustainable cities,\u201d said Mark Southwell, chief executive of AECOM\u2019s global Transportation business. \u201cThis project will set Hamilton apart as a leader in public transportation, preparing it for a more livable, low-carbon future. As we deliver major transit projects across the globe, the Hamilton LRT is the latest example of how our <em><a href=\"https:\/\/publications.aecom.com\/sustainable-legacies\/\">Sustainable Legacies<\/a> <\/em>strategy continues to improve social and environmental outcomes for communities.\u201d<\/p>\n\n\n\n<p>The LRT is designed to provide connectivity across Hamilton with new light rail vehicles running along dedicated track for greater safety, frequency, and reliability. In addition, the project plans to support sustainable growth and city-building through revitalization of critical utilities and general infrastructure along the route.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>About AECOM&nbsp;<\/strong><\/h3>\n\n\n\n<p>AECOM (NYSE: ACM) is the world\u2019s trusted infrastructure consulting firm, delivering professional services throughout the project lifecycle \u2013 from advisory, planning, design and engineering to program and construction management. On projects spanning transportation, buildings, water, new energy and the environment, our public- and private-sector clients trust us to solve their most complex challenges. Our teams are driven by a common purpose to deliver a better world through our unrivaled technical and digital expertise, a culture of equity, diversity and inclusion, and a commitment to environmental, social and governance priorities.&nbsp;AECOM&nbsp;is a Fortune 500 firm and its Professional Services business had revenue of&nbsp;US$13.1 billion&nbsp;in fiscal year 2022. See how we are delivering sustainable legacies for generations to come at&nbsp;<a href=\"http:\/\/aecom.com\/\">aecom.com<\/a>&nbsp;and @AECOM.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Forward-Looking Statements<\/strong><\/h3>\n\n\n\n<p><em>All statements in this communication other than statements of historical fact are \u201cforward-looking statements\u201d for purposes of federal and state securities laws, including any statements of the plans, strategies and objectives for future operations, profitability, strategic value creation, risk profile and investment strategies, and any statements regarding future economic conditions or performance, and the expected financial and operational results of&nbsp;AECOM. Although we believe that the expectations reflected in our forward-looking statements are reasonable, actual results could differ materially from those projected or assumed in any of our forward-looking statements. Important factors that could cause our actual results, performance and achievements, or industry results to differ materially from estimates or projections contained in our forward-looking statements include, but are not limited to, the following: our business is cyclical and vulnerable to economic downturns and client spending reductions; limited control over operations that run through our joint venture entities; liability for misconduct by our employees or consultants; failure to comply with laws or regulations applicable to our business; maintaining adequate surety and financial capacity; potential high leverage and inability to service our debt and guarantees; ability to continue payment of dividends; exposure to political and economic risks in different countries, including tariffs; currency exchange rate and interest fluctuations; retaining and recruiting key technical and management personnel; legal claims; inadequate insurance coverage; environmental law compliance and adequate nuclear indemnification; unexpected adjustments and cancellations related to our backlog; partners and third parties who may fail to satisfy their legal obligations;&nbsp;AECOM Capital&nbsp;real estate development projects; managing pension cost; cybersecurity issues, IT outages and data privacy; risks associated with the expected benefits and costs of the sale of our Management Services and self-perform at-risk civil infrastructure, power construction and oil and gas construction businesses, including the risk that any contingent purchase price adjustments from those transactions could be unfavorable and result in lower aggregate cash proceeds and any future proceeds owed to us under those transactions could be lower than we expect; as well as other additional risks and factors that could cause actual results to differ materially from our forward-looking statements set forth in our reports filed with the&nbsp;Securities and Exchange Commission. Any forward-looking statements are made as of the date hereof. We do not intend, and undertake no obligation, to update any forward-looking statement.<\/em><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Media Contact<\/strong>:<br>Brendan Ranson-Walsh<br>Senior Vice President, Global Communications<br>1.213.996.2367<br><a href=\"mailto:Brendan.Ranson-Walsh@aecom.com\">Brendan.Ranson-Walsh@aecom.com<\/a><\/p>\n\n\n\n<p><strong>Investor Contact<\/strong>:<br>Will Gabrielski<br>Senior Vice President, Finance, Treasurer<br>1.213.593.8208<br><a href=\"mailto:William.Gabrielski@aecom.com\">William.Gabrielski@aecom.com<\/a><\/p>\n","protected":false},"featured_media":0,"template":"","yst_prominent_words":[],"class_list":["post-3009","press-release","type-press-release","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release\/3009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release"}],"about":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/types\/press-release"}],"version-history":[{"count":3,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release\/3009\/revisions"}],"predecessor-version":[{"id":3012,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/press-release\/3009\/revisions\/3012"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/media?parent=3009"}],"wp:term":[{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/yst_prominent_words?post=3009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}