{"id":8246,"date":"2026-07-13T20:54:36","date_gmt":"2026-07-13T20:54:36","guid":{"rendered":"https:\/\/aecom.com\/en-ca\/projects\/reconstruction-turcot-interchange-2\/"},"modified":"2026-07-13T20:57:27","modified_gmt":"2026-07-13T20:57:27","slug":"reconstruction-turcot-interchange","status":"publish","type":"project","link":"https:\/\/aecom.com\/en-ca\/projects\/reconstruction-turcot-interchange\/","title":{"rendered":"Reconstruction of the Turcot Interchange\u00a0"},"content":{"rendered":"\n<p>The Province of Quebec selected AECOM, as part of a consortium, as the project\/construction manager responsible for rebuilding the 40-year-old Turcot Interchange&nbsp;in&nbsp;Montreal. At a cost of CAD$3.67&nbsp;billion,&nbsp;the project involved rebuilding the Turcot, De La V\u00e9rendrye,&nbsp;Angrignon, and Montreal West interchanges, as well as stretches of Autoroutes 15, 20,&nbsp;and 720.&nbsp;<\/p>\n\n\n\n<p>The Turcot Interchange is a major traffic hub in the Montreal area, connecting Autoroutes 15, 20 and 720 and providing access to the Champlain Bridge. It is also a vital link between the Montreal Pierre-Elliott-Trudeau International Airport and downtown. At the crossroads of the two busiest autoroutes in Qu\u00e9bec, the Turcot Interchange is the most important interchange in the Montreal area,&nbsp;facilitating&nbsp;the movement of goods and services and providing access to major recreation and employment centres.&nbsp;<\/p>\n\n\n\n<p>As the project\/construction manager, AECOM provided project oversight; validated design criteria and engineering concepts; prepared environmental, health and safety project standards; coordinated up to 50 professional services contracts; coordinated bid packages; participated in the acquisition process, an alternative delivery mode; managed construction; and assisted the owner in managing the alternative delivery mode agreement.&nbsp;<\/p>\n\n\n\n<p>The project location includes high-density residential and commercial areas with heavy traffic of approximately 280,000 vehicles per day, which was&nbsp;maintained&nbsp;throughout&nbsp;construction. AECOM also coordinated the needs of&nbsp;numerous&nbsp;stakeholders, including multiple municipalities, public utility companies, transport agencies, railway companies, citizen associations, and other government agencies.<\/p>\n\n\n\n<div style=\"height:36px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"200994\" src=\"https:\/\/aecom.com\/content\/wp-content\/uploads\/2016\/08\/Turcot_Portrait_RoadandRail-683x1024.jpg\" alt=\"\" class=\"wp-image-200994\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"200996\" src=\"https:\/\/aecom.com\/content\/wp-content\/uploads\/2016\/08\/Turcot_Landscape_Horizon-1024x683.jpg\" alt=\"\" class=\"wp-image-200996\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"200997\" src=\"https:\/\/aecom.com\/content\/wp-content\/uploads\/2016\/08\/Turcot_Portrait_Cityscape-683x1024.jpg\" alt=\"\" class=\"wp-image-200997\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"200995\" src=\"https:\/\/aecom.com\/content\/wp-content\/uploads\/2016\/08\/Turcot-Interchange-Rail-201909-17-1024x683.jpg\" alt=\"\" class=\"wp-image-200995\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"200998\" src=\"https:\/\/aecom.com\/content\/wp-content\/uploads\/2016\/08\/Turcot_Portrait_Jack-684x1024.jpg\" alt=\"\" class=\"wp-image-200998\"\/><\/figure>\n<\/figure>\n","protected":false},"author":701,"featured_media":8248,"template":"","tags":[],"city":[13],"class_list":["post-8246","project","type-project","status-publish","has-post-thumbnail","hentry","city-montreal"],"acf":[],"metadata":{"_locations":["Canada","Quebec"],"_regions":["Americas"],"_markets":["Transportation","Highways &amp; Roads","Freight Rail"],"city":["Montreal"],"featured_image":"https:\/\/aecom.com\/en-ca\/wp-content\/uploads\/2016\/08\/Turcot_Landscape_Horizon.jpg"},"_links":{"self":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/project\/8246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/users\/701"}],"version-history":[{"count":2,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/project\/8246\/revisions"}],"predecessor-version":[{"id":8250,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/project\/8246\/revisions\/8250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/media\/8248"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/media?parent=8246"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/tags?post=8246"},{"taxonomy":"city","embeddable":true,"href":"https:\/\/aecom.com\/en-ca\/wp-json\/wp\/v2\/city?post=8246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}