{"id":806,"date":"2015-10-21T19:22:55","date_gmt":"2015-10-21T19:22:55","guid":{"rendered":"https:\/\/aecom.com\/fr-ca\/projects\/lorne-park-water-treatment-plant\/"},"modified":"2023-12-01T14:26:54","modified_gmt":"2023-12-01T14:26:54","slug":"lorne-park-water-treatment-plant","status":"publish","type":"project","link":"https:\/\/aecom.com\/fr-ca\/projects\/lorne-park-water-treatment-plant\/","title":{"rendered":"Usine de traitement d&#8217;eau de Lorne Park"},"content":{"rendered":"\n<div class=\"aecom-custom-block block-intro-text\" style=\"margin-top: 0px; margin-bottom: 40px\">\n    <p class=\"editor-emphasized\">\n        The Lorne Park Water Treatment Plant in the Regional Municipality of Peel, Ontario was originally built in 1975. In order to service the projected population up to year 2031, the Region of Peel retained AECOM and Genivar to expand the plant&#8217;s capacity to 500 megaliters per day (ML\/d), which will make this project the largest membrane filtration system in the world.    <\/p>\n<\/div>\n\n\n<p>The Lorne Park WTP&#8217;s current capacity of 347 ML\/d is divided into two treatment plants: &#8220;old&#8221; rated at 227 ML\/d, consisting of eight conventional treatment trains and &#8220;new&#8221; rated at 120 ML\/d, consisting of four conventional treatment trains. To attain the desired capacity of 500 ML\/d and meet the region&#8217;s criteria, the &#8220;old&#8221; plant will be retrofitted with a membrane filtration system, providing 380 ML\/d through 16 membrane filtration trains. This allows the region to provide an operational margin of safety above Ontario&#8217;s Drinking Water Quality Standard, address emerging issues, and achieve treatment optimization in actual operations.<\/p>\n\n\n\n<p>L&#8217;usine sera \u00e9quip\u00e9e d&#8217;un syst\u00e8me de d\u00e9sinfection aux ultraviolets afin d&#8217;\u00e9liminer les agents pathog\u00e8nes et une oxydation avanc\u00e9e pour contr\u00f4ler le go\u00fbt et l&#8217;odeur. Lorne Park WTP is built largely beneath a community park on the shore of Lake Ontario. Due to its unique location, special efforts must be taken to minimize impacts. Par cons\u00e9quent, la conception int\u00e8gre les activit\u00e9s en cours et les travaux se limitent \u00e0 un petit espace pour optimiser l&#8217;utilisation de l&#8217;infrastructure actuelle. La fin du projet est pr\u00e9vue pour 2012.<\/p>\n","protected":false},"author":7,"featured_media":808,"template":"","tags":[],"city":[53],"class_list":["post-806","project","type-project","status-publish","has-post-thumbnail","hentry","city-peel"],"acf":[],"_links":{"self":[{"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/project\/806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/users\/7"}],"version-history":[{"count":3,"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/project\/806\/revisions"}],"predecessor-version":[{"id":3674,"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/project\/806\/revisions\/3674"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/media\/808"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/media?parent=806"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/tags?post=806"},{"taxonomy":"city","embeddable":true,"href":"https:\/\/aecom.com\/fr-ca\/wp-json\/wp\/v2\/city?post=806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}