{"id":20181,"date":"2015-10-16T17:14:19","date_gmt":"2015-10-16T17:14:19","guid":{"rendered":"https:\/\/aecom.com\/fr\/projects\/sentinel-data-centers\/"},"modified":"2018-10-03T13:13:11","modified_gmt":"2018-10-03T17:13:11","slug":"sentinel-data-centers","status":"publish","type":"project","link":"https:\/\/aecom.com\/fr\/projects\/sentinel-data-centers\/","title":{"rendered":"Sentinel Data Centers"},"content":{"rendered":"<p>Sentinel Data Centers needed to convert their existing 220,000-square-foot warehouse into a multi-tenant Tier 3 data center facility. AECOM worked with Sentinel throughout 2011 and 2012, providing construction management services over a three-phase delivery. When Sentinel decided to pursue LEED Gold certification for the project, AECOM helped them to meet their sustainability targets.<\/p>\n<p>Phase I: Four 10,000-square-foot data pods<\/p>\n<ul>\n<li>Construction of expanded infrastructure, including a new 69 kilovolts substation, outdoor modular chiller plants, four 2,500 kilowatts emergency generators, three UPS (uninterruptible power supply) systems, and associated switchgear.<\/li>\n<li>Two 25,000 gallon underground fuel oil tanks and associated fuel oil piping to tie into the generators.<\/li>\n<li>Pod cooling provided by 32 Liebert 50-ton CRAC (Computer room air conditioning) units and UPS rooms serviced by three 30\u2011ton CRAC units.<\/li>\n<li>Build-out of 10,000-square-foot of office space and storage<\/li>\n<\/ul>\n<p>Phase II additions:<\/p>\n<ul>\n<li>Four generators<\/li>\n<li>Two outdoor modular chiller plants<\/li>\n<li>Three UPS systems<\/li>\n<li>Five 10,000-square-foot data pods<\/li>\n<li>32 50-ton CRAC units<\/li>\n<li>Two 25,000-gallon fuel oil tanks<\/li>\n<li>Nine 30-ton CRAC\u2019s for UPS room cooling<\/li>\n<\/ul>\n<p>Phase III: Construction of an 86,000-square-foot expansion with four generators, five 10,000-square-foot data pods, two UPS systems, 32 50-ton CRAC units and six 30-ton CRACs<\/p>\n<ul>\n<li>Modular chiller plant<\/li>\n<li>Eight pre-action zones to protect all data halls, corridors, UPS rooms and generator rooms<\/li>\n<li>Sprinkler system to cover office areas<\/li>\n<\/ul>\n","protected":false},"author":7,"featured_media":6064,"template":"","tags":[],"city":[419],"class_list":["post-20181","project","type-project","status-publish","has-post-thumbnail","hentry","city-somerset"],"acf":[],"_links":{"self":[{"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/project\/20181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"version-history":[{"count":0,"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/project\/20181\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/media\/6064"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/media?parent=20181"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/tags?post=20181"},{"taxonomy":"city","embeddable":true,"href":"https:\/\/aecom.com\/fr\/wp-json\/wp\/v2\/city?post=20181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}