For the Pier G Berths G230-G236 Terminal Redevelopment project, part of the multi-year Pier G Redevelopment Program, AECOM (legacy Shimmick) procured and installed new electrical distribution equipment including 12.47kV switchgear assemblies, 2,500kV transformers, 480v switchgear assemblies and 192 refrigerated container receptacles.

AECOM also performed backbone raceway work connecting the electrical equipment, which consisted of procuring and installing 130,000 feet of underground PVC conduit, 30,000 feet of trenching, 18,000 feet of 15kV medium voltage cable, and 405,000 feet of 600V-THHN building wire. In addition, AECOM erected and energized 13 120-ft tall mast lighting poles.

The project was completed in 2014.