AECOM (legacy Shimmick) performed the Port of Los Angeles Berth 142-147 project, which comprised the construction of an intermodal container transfer facility (ICTF).

The work included the demolition of the existing Pier A rail yard; new utilities with steel casings, including water, sewer, storm drain, electrical and communications; installation of track work and special track work; railway signal equipment; train in motion system; and optical character recognition (OCR) portal, turnover anchor pit and compressed air system.

The project also included the construction of a secondary gate with truck scales, gatearms and concrete pedestals; compressor building, guard booth and customs/border protection office building; concrete and asphalt concrete pavement; an installation of signage, striping and fencing on k-rail.

Work was completed in 2016.