AECOM provided construction management services at the design, preconstruction and construction stage for this new manufacturing plant in the Ruza district of Moscow. The plant, which manufactures audio/video units, digital plasma panels, liquid-crystal displays, refrigerators and washing machines, includes two production buildings, ancillary facilities, open storage areas, external utilities and landscaping.

To provide the project with the necessary resources, AECOM developed a plan of enabling works to relocate an existing high-pressure gas main, overhead transmission and telecommunication lines. The project was fast-tracked for rapid completion due to an extremely cold winter.

Learn more about AECOM and process led design