This $2.25 Billion project was the first rail Design-Build-Operate-Maintain project in the U.S. at time of contract. The work includes 16 miles of mainline track and 24 passenger stations; an electrified double track with overhead catenary power supply; 53 light rail vehicles; four park-ride lots; an 100,000-SF maintenance shop; an 75,000-SF vehicle storage building; and a 40-acre storage yard.