The OCPC Campus Bridges project was undertaken to connect both sides of the new OCPC office campus across the future Marine Way. AECOM (legacy Shimmick Construction) performed the design-build project, which comprised the construction of the North Bridge, a cast-in-place concrete box girder bridge providing vehicular connection to both sides of the campus; and the larger Plaza Deck, a cast-in-place concrete slab bridge which will support a planned park/pedestrian bridge providing pedestrian access between buildings.

The Plaza Deck structure features innovative fire protection: the inclusion of polypropylene fibers in the concrete to mitigate potential fire damage to the structure.

Both bridges are being designed and constructed to CalTrans standards. The project was completed in 2017.