{"id":10965,"date":"2015-02-04T00:00:00","date_gmt":"1970-01-01T00:00:00","guid":{"rendered":"https:\/\/aecom.com\/taiwan\/press\/rapid-bridge-replacement-the-key-to-kiwirails-success\/"},"modified":"2017-10-19T06:21:58","modified_gmt":"2017-10-19T10:21:58","slug":"rapid-bridge-replacement-the-key-to-kiwirails-success","status":"publish","type":"press-release","link":"https:\/\/aecom.com\/tw\/press-releases\/rapid-bridge-replacement-the-key-to-kiwirails-success\/","title":{"rendered":"Rapid bridge replacement the key to KiwiRail\u2019s success"},"content":{"rendered":"<p>The East Coast Main Trunk (ECMT) line is one of New Zealand\u2019s busiest freight routes.&#160;<\/p>\n<p>KiwiRail wanted to increase the amount that could be carried on the ECMT route, but an ailing rail bridge meant speed restrictions were slowing down the path to &#160;success.<\/p>\n<p>They appointed AECOM along with Novare Design to investigate options for renewing the bridge. Our team provided project management and construction observation for the project, working closely with stakeholders to ensure international shipping delays did not disrupt the project. The bridge changeover was completed within the scheduled 36-hour window, with minimal disruption to rail traffic.<\/p>\n<p>The new bridge has twin-pile concrete piers and a weathering steel ballast tray design, meaning increased load capacity, less maintenance, and better track performance and reliability.&#160; Speed restrictions on the bridge have now been lifted, and the whole-of-life cost has been reduced \u2013 leaving room for KiwiRail\u2019s freight business to grow for years to come.<\/p>\n<p>You can <a href=\"http:\/\/vimeo.com\/117234750\">watch a time-lapse of the bridge replacement here<\/a>.<\/p>\n<p>&#160;<\/p>\n","protected":false},"featured_media":0,"template":"","yst_prominent_words":[],"class_list":["post-10965","press-release","type-press-release","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/press-release\/10965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/press-release"}],"about":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/types\/press-release"}],"version-history":[{"count":0,"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/press-release\/10965\/revisions"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/media?parent=10965"}],"wp:term":[{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/yst_prominent_words?post=10965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}