{"id":11159,"date":"2015-06-11T00:00:00","date_gmt":"1970-01-01T00:00:00","guid":{"rendered":"https:\/\/aecom.com\/taiwan\/press\/aecom-announced-today-that-the-u-s-department-of-energy-has-added-an-additional-year-to-the-current-river-corridor-closure-contract-held-by-the-aecom-led-washington-closure-hanford-llc-joint-venture\/"},"modified":"2017-10-19T06:35:30","modified_gmt":"2017-10-19T10:35:30","slug":"aecom-announced-today-that-the-u-s-department-of-energy-has-added-an-additional-year-to-the-current-river-corridor-closure-contract-held-by-the-aecom-led-washington-closure-hanford-llc-joint-venture","status":"publish","type":"press-release","link":"https:\/\/aecom.com\/tw\/press-releases\/aecom-announced-today-that-the-u-s-department-of-energy-has-added-an-additional-year-to-the-current-river-corridor-closure-contract-held-by-the-aecom-led-washington-closure-hanford-llc-joint-venture\/","title":{"rendered":"AECOM announced today that the U.S. Department of Energy has added an additional year to the current River Corridor Closure contract held by the AECOM-led Washington Closure Hanford LLC joint venture."},"content":{"rendered":"<p>AECOM announced today that the U.S. Department of Energy has added an additional year to the current River Corridor Closure contract held by the AECOM-led Washington Closure Hanford LLC joint venture.<\/p>\n<p>This $148-million extension will run from Sept. 30, 2015, to Sept. 30, 2016. Work will focus primarily on completing the trench work at the 618-10 \u201cburial ground\u201d and placing the Chemical Materials Engineering Laboratory (Building 324) in a maintenance status for future demolition.\u00a0 Operations at the Hanford Environmental Restoration Disposal Facility will also continue.<\/p>\n<p>\u201cWe are pleased to have been awarded this extension,\u201d said Randy Wotring, president of AECOM\u2019s management services group. \u201cAECOM and our heritage companies have been successful in cleaning up more than 534 waste sites, demolishing over 323 buildings, and placing two plutonium-production reactors in interim safe storage along the Columbia River.\u00a0 This extension will enable our joint venture to complete additional work along Hanford\u2019s 220-square-mile river corridor while protecting the Columbia River.\u201d<\/p>\n<p><b>About<\/b>\u00a0<b>AECOM<\/b><br \/>\nAECOM\u00a0is a premier, fully integrated professional and technical services firm positioned to design, build, finance and operate infrastructure assets around the world for public- and private-sector clients. With nearly 100,000 employees \u2014 including architects, engineers, designers, planners, scientists and management and construction services professionals \u2014 serving clients in over 150 countries around the world,\u00a0AECOM\u00a0is ranked as the #1 engineering design firm by revenue in <i>Engineering News-Record<\/i>\u00a0magazine\u2019s annual industry rankings, and has been recognized by\u00a0<i>Fortune\u00a0<\/i>magazine as a World\u2019s Most Admired Company. The firm is a leader in all of the key markets that it serves, including transportation, facilities, environmental, energy, oil and gas, water, high-rise buildings and government. AECOM\u00a0provides a blend of global reach, local knowledge, innovation and technical excellence in delivering customized and creative solutions that meet the needs of clients\u2019 projects. A\u00a0<i>Fortune 500<\/i>\u00a0firm,\u00a0AECOM\u00a0companies, including\u00a0URS Corporation\u00a0and\u00a0Hunt Construction Group, had revenue of approximately\u00a0$19 billion\u00a0during the 12 months ended\u00a0March 31, 2015. More information on\u00a0AECOM\u00a0and its services can be found at\u00a0<a href=\"https:\/\/aecom.com\/taiwan\">aecom.com\/taiwan<\/a>.<\/p>\n<p><i>Forward-Looking Statements: All statements in this press release other than statements of historical fact are &#8220;forward-looking statements&#8221; for purposes of federal and state securities laws, including the future term, value and performance under the River Corridor Closure contract as well as other future business and economic conditions. Actual results could differ materially from those projected or assumed in any of our forward-looking statements. Important factors that could cause actual results to differ materially from our forward-looking statements are set forth in our quarterly report on Form 10-Q for the fiscal quarter ended March 31, 2015, and our other reports filed with the U.S. Securities and Exchange Commission. AECOM does not intend, and undertakes no obligation, to update any forward-looking statement.<\/i><\/p>\n<p style=\"padding: 0px;background-color: #ffffff;text-indent: 0px;font-style: normal;text-align: start;font-variant: normal;color: #666666;font-weight: normal;margin: 0.5em 0px 1em;letter-spacing: normal;font-family: Arial, Helvetica, sans-serif;font-size: 11.6000003814697px;line-height: normal\">NR 15-0606<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"featured_media":0,"template":"","yst_prominent_words":[],"class_list":["post-11159","press-release","type-press-release","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/press-release\/11159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/press-release"}],"about":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/types\/press-release"}],"version-history":[{"count":0,"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/press-release\/11159\/revisions"}],"wp:attachment":[{"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/media?parent=11159"}],"wp:term":[{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/aecom.com\/tw\/wp-json\/wp\/v2\/yst_prominent_words?post=11159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}