AECOM helped our client minimize costs, maximize quality and overcome the challenges of remote site development by fabricating pipe systems, pipe racks, and process modules off-site then shipping and installing them at site. For the Albian Sands Froth Treatment and auxiliary Tank Farm, we installed approximately 180 modules, of which 94 were wholly constructed at one of AECOMs many fabrication and modularization facilities in Alberta.
In addition to providing construction services, AECOM maintains a permanent operational base in Fort McMurray, Alberta with equipment and personnel available to perform a critical range of oilfield production services to support our customers’ operations throughout the region.