AECOM, a premier, fully integrated global infrastructure firm has been appointed by the Land Transport Authority (LTA) of Singapore as the lead consultant to conduct the Advanced Engineering Study (AES) for the complete design of the Singapore stretch of the Kuala Lumpur-Singapore High Speed Rail Infrastructure.

AECOM and its consortium partners will provide architectural, civil, structural, electrical, mechanical and other associated design services needed for the Jurong East terminus, tunnels and the bridge connecting Singapore and Malaysia at the Straits of Johor.

Following a rigorous tender process, AECOM was selected to deliver the SGD $24.6-million contract based on its strong track record in delivering high speed rail (HSR) projects globally and its team’s leading technical expertise understanding the scope of work involved in designing the HSR.

“The Kuala Lumpur-Singapore High Speed Rail is a key project for the governments of Singapore and Malaysia and will be an iconic landmark, providing the strategic link between both cities,” said Billy Wong, AECOM’s regional executive of Southeast Asia. “AECOM is delighted to apply our global high speed rail capability in the design of this groundbreaking high-speed rail infrastructure project, which is the first inter-country high speed rail service in Southeast Asia.”

AECOM has assembled a global team of high speed rail specialists from Singapore, Hong Kong and Spain to deliver the project. The team will draw upon the design and planning expertise gained from working on the West Kowloon Terminus for the Express Rail Link in Hong Kong, Hong Kong-Zhuhai-Macao Cross Boundary Facilities and the HSR infrastructure in Spain.

Having worked with LTA to design the North East Line, Circle Line, Downtown Line and Thomson-East Coast Line, and the Tuas West Extension, AECOM Singapore has a proven track record in the local market. The local Singapore team is already conducting an engineering consultancy study for the Rapid Transit System Link between Singapore and Johor Bahru, Malaysia.

In undertaking the AES, AECOM and its consortium partners – HSR architect Farrells and local architects Architects 61 and CPG Consultants – have commenced work on the HSR concept design and will facilitate on-schedule implementation through the provision of “buildable” design.

“The Jurong East terminus design will be a key international gateway to travelers and should be a true reflection of Singapore, meeting its high standards for functionality, safety, efficiency and accessibility,” said Mahatma Subbaiyan, vice president of transportation, AECOM Singapore. “With our experience and technical knowledge in HSR design, we will ensure that the project attracts the best international and local bidders as we transit from design to build phase.”

At present, the Singapore-KL route is served by planes and buses. Once completed in 2026, its tracks will run for 350 kilometers along the west coast of Peninsula Malaysia –with 15 kilometers in Singapore and 335 kilometers in Malaysia – and is expected to cut travel time between both cities to 90 minutes.

About AECOM
AECOM is built to deliver a better world. We design, build, finance and operate infrastructure assets for governments, businesses and organizations in more than 150 countries. As a fully integrated firm, we connect knowledge and experience across our global network of experts to help clients solve their most complex challenges. From high-performance buildings and infrastructure, to resilient communities and environments, to stable and secure nations, our work is transformative, differentiated and vital. A Fortune 500 firm, AECOM had revenue of approximately $17.4 billion during fiscal year 2016. See how we deliver what others can only imagine at aecom.com and @AECOM.

AECOM Media Contact:
Jessy Chua
Jessy.Chua@aecom.com
+65 8533 5714

01-Aug-2011 AECOM is using Building Information Modeling (BIM) as part of the Calgary International Airport (YYC) International Facilities Project (IFP) in Canada.
04-Aug-2011 AECOM Technology Corporation (NYSE: ACM), a leading provider of professional technical and management support services for government and commercial clients around the world, announced today its financial results for the third quarter of fiscal year 2011, which ended June 30, 2011.  
09-Aug-2011 AECOM announced today that it has been awarded a design and construction management contract for the US$66-million Dugway West Interceptor Relief Sewer in the Cleveland area. AECOM’s total fees are worth approximately US$10 million.
10-Aug-2011 AECOM announced today that it has won a task order contract from the U.S. Air Force for Contract Field Teams (CFT) worth up to US$30 million, if all options are exercised.
15-Aug-2011 AECOM is using phased array ultrasonic testing (PAUT) — an advanced method of ultrasonic testing — to reduce inspection times and deliver more accurate results. The emerging technology makes it easier to inspect components with complex geometry and increases the chance of detecting defects.
16-Aug-2011 AECOM announced today that its Board of Directors has authorized the repurchase of up to $200 million of its common stock.
16-Aug-2011 AECOM announced today that a joint venture in which it participates with Parsons has been awarded a US$150-million program-management contract by the San Francisco Public Utilities Commission (SFPUC).
17-Aug-2011 AECOM announced today that TEC-AECOM Pacific, a joint venture in which it participates with TEC Inc., has been awarded an indefinite delivery/indefinite quantity (IDIQ) contract, worth up to US$50 million, from the U.S. Naval Facilities Engineering Command (NAVFAC) Pacific, Pearl Harbor, Hawaii.
30-Aug-2011 AECOM announced today that it was awarded a US$20-million services contract for the construction of the US$1.4-billion Ravensworth North mine expansion project in New South Wales, Australia.
01-Sep-2011 AECOM announced today that it has been awarded a US$35.5-million contract by the City of Edmonton, Canada, for its Southeast to West light rail transit (LRT) expansion.
07-Sep-2011 AECOM announced today that Resolution Consultants Inc., a joint venture between AECOM and EnSafe Inc., was awarded an indefinite delivery/indefinite quantity (IDIQ) contract by the U.S. Naval Facilities Engineering Command (NAVFAC) Atlantic.
07-Sep-2011 AECOM employees participate in a fundraiser, “Christmas in July” to benefit homeless children living in Broward County, Fla.
08-Sep-2011 AECOM announced today that it will be presenting at D.A. Davidson’s 10th annual Engineering and Construction Conference in San Francisco at the Omni Hotel.
13-Sep-2011 The American Public Works Association recognized AECOM’s ability to successfully manage and administer public works projects while building a solid partnership between major stakeholders.
13-Sep-2011 AECOM announced that Donald D. Graul joined the company as senior vice president, global alternative delivery, for its Transportation business.
14-Sep-2011 AECOM has been ranked number one on Consulting-Specifying Engineer (CSE) magazine’s MEP Giants list for 2011.
15-Sep-2011 AECOM’s project management team for the Airport Expansion Program at Fort Lauderdale-Hollywood International Airport in Fort Lauderdale, Fla., participated in the annual “Christmas in July” fundraiser event to benefit homeless children living in Broward County.
20-Sep-2011 A team of 32 employees from Ontario, Canada, raised CDN$11,917 for the Heart and Stroke Foundation during the 24th annual Becel Ride for Heart corporate challenge event in June 2011.
21-Sep-2011 Bruce Dandie, P.E., has joined AECOM, as senior vice president of its North America Tunnel Ventilation practice within the transportation business.
21-Sep-2011 AECOM announced that Michael Della Rocca will assume the role of North America chief executive, effective Oct. 1, 2011. In this position, Della Rocca will lead AECOM’s operations throughout the U.S. and Canada.
22-Sep-2011 AECOM announced that it has been awarded a CA$4.6-million (US$4.8-million) contract by the Government of Alberta Ministry of Transportation for the Macleod Trail/Stoney Trail Interchange project in Calgary, Alberta.
27-Sep-2011 AECOM will participate in the Ethisphere Institute’s “Ethics Drives Performance” conference tomorrow in New York City, hosted by NYSE Euronext.
28-Sep-2011 Il n’arrive pas souvent qu’on puisse jouer un rôle essentiel dans la préservation d’un élément de notre histoire. Mais, Erik Phaneuf, archéologue d’AECOM, a fait juste cela.
28-Sep-2011 It’s not very often someone gets to play an integral part in preserving a piece of our history. But AECOM Archaeologist Erik Phaneuf is doing just that.
28-Sep-2011 Doug Brown has joined AECOM as principle water technology leader of its Water Treatment practice within its water business in the Americas.
29-Sep-2011 AECOM announced today that it was awarded a US$25-million contract from the City of Indianapolis to provide construction management services for the US$280-million Deep Rock Tunnel Connection (DRTC) and dewatering pump station in Indianapolis.
29-Sep-2011 AECOM announced that it was awarded a US$25-million contract from the City of Indianapolis to provide construction management services for the US$280-million Deep Rock Tunnel Connection (DRTC) and dewatering pump station in Indianapolis.
07-Oct-2011 Luigi (Lou) Bruno has joined AECOM as vice president of its Minerals and Metals practice within the firm’s North America mining business.
10-Oct-2011 AECOM is using Building Information Modeling (BIM) as part of the U.S. Army’s new Martin Army Community Hospital project for the U.S. Army Corps of Engineers, Savannah district, in Fort Benning, Ga.
12-Oct-2011 AECOM announced today that it has been awarded two contracts worth a total value of US$14.1 million from the Ethiopian Electric Power Corporation (EEPCO).
13-Oct-2011 AECOM has announced that Matthew Sutton has been named chief executive of the company’s environment business line.
13-Oct-2011 AECOM announced today that its master plan for the 2016 Rio Olympic and Paralympic Games has been accepted by the city of Rio de Janeiro.
14-Oct-2011 A consortium consisting of AECOM, Grimshaw Architects, PwC and Tract Consultants will develop a detailed property master plan for 2,471 acres (1,000 hectares) of developable land at Brisbane Airport in Australia, after winning a property master plan design competition held by the Brisbane Airport Corporation Pty Limited (BAC).
18-Oct-2011 AECOM will release results for its fourth quarter and full fiscal year 2011, which ended on Sept. 30, 2011, before the opening of trading on the New York Stock Exchange on Thursday, Nov. 10, 2011.
20-Oct-2011 Max Nassar, vice president, transportation, has been appointed to the Construction Management Association of America’s (CMAA) board of directors for the Gulf Coast Chapter.
Page 4 of 23