30-year industry veteran will be responsible for providing AECOM leadership at the Department of Energy repository

AIKEN, S.C. (May 4, 2017) — AECOM, a premier, fully integrated global infrastructure firm, announced today that Bruce Covert has been appointed president and project manager of Nuclear Waste Partnership (NWP), the AECOM-led company that manages the U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP).

“Bruce is a proven leader in the nuclear industry with extensive experience in the DOE market,” said John Vollmer, president, Management Services group. “His expertise and leadership will enable Nuclear Waste Partnership to safely and effectively operate WIPP for the long term.”

Mr. Covert brings more than 30 years of experience with AECOM legacy companies in the management and operation of nuclear and other high-hazard facilities for the DOE and the U.K.’s Nuclear Decommissioning Authority (NDA). His expertise envelops every aspect of the nuclear facility life-cycle, from design and construction to start-up, operations, decommissioning, deactivation, decontamination and demolition.

“I’m extremely excited to join NWP,” said Mr. Covert. “I commend the Nuclear Waste Partnership employees for their hard work in getting WIPP back into operation this year. I look forward to helping the DOE advance its mission at WIPP and its role in cleaning up the DOE complex.”

Most recently, Mr. Covert served as AECOM group vice president and project director for waste management projects for Dounreay Site Restoration Limited, Dounreay, U.K. He was responsible for safe delivery of the Waste and Shaft & Silo projects at Britain’s former center for fast reactor research and development. His leadership responsibilities included delivering the site’s waste program including characterization, transportation, storage and disposal, along with treatment of low level and intermediate level waste from the site’s decommissioning program. He manages over 12,000 drums of contact-handled and remote-handled intermediate level radioactive waste. Mr. Covert was also an active member of the National Low Level Waste Program Board established to implement the U.K.’s strategy for the management of solid low level radioactive waste from the nuclear industry.

His most recent work in the U.S. was as project director, environmental, safety, health and quality for Washington Closure Hanford (WCH) at the DOE’s Hanford site, where he led development of a “best-in-class” contractor assurance system program that yielded outstanding safety, cost and schedule performance. He also managed the regulatory relationship with the Environmental Protection Agency and Washington State Department of Ecology to allow site closure of the 220 square-mile River Corridor. As the WCH project director for waste operations, he managed the recovery of the Environmental Restoration Disposal Facility, including developing and implementing regulatory and operational basis.

Mr. Covert replaces Phil Breidenbach who led recovery and restart activities at WIPP since April 2015. Mr. Breidenbach will return to AECOM supporting other projects in the DOE and nuclear market.

“I want to thank Phil Breidenbach for his fantastic leadership and steady hand that led to the restart of transuranic waste operations at WIPP, and the resumption of shipments from the DOE sites around the nation,” said Vollmer. “I wish Phil all the best in his next assignment at AECOM.”

About AECOM
AECOM is built to deliver a better world. We design, build, finance and operate infrastructure assets for governments, businesses and organizations in more than 150 countries. As a fully integrated firm, we connect knowledge and experience across our global network of experts to help clients solve their most complex challenges. From high-performance buildings and infrastructure, to resilient communities and environments, to stable and secure nations, our work is transformative, differentiated and vital. A Fortune 500 firm, AECOM had revenue of approximately $17.4 billion during fiscal year 2016. See how we deliver what others can only imagine at aecom.com and @AECOM.

About NWP
AECOM and BWXT Technical Services Group, Inc. formed Nuclear Waste Partnership LLC to support the DOE Office of Environmental Management and Carlsbad Field Office in achieving WIPP and National TRU Waste Program goals.

AMERICAS 17-0503

Media Contact:
Keith Wood
Vice President, Marketing & Communications
1.803.502.5748
Keith.Wood@aecom.com

02-Jan-2015 The proposed Greater Toronto Area (GTA) West transportation corridor will extend from the Highway 401/407ETR interchange in Halton Region to Highway 400 in Vaughan, Ontario.
05-Jan-2015 AECOM joint venture awarded FEMA contract for flood and other risk data services with a contract ceiling of US$600 million
12-Jan-2015 David Philp joins AECOM as Director of Building Information Modelling (BIM) for EMEA and India, to further augment our digital and project data capabilities
14-Jan-2015 The Construction Management Association of America (CMAA) Southern California Chapter has named AECOM, the program manager for the Los Angeles Community College District’s (LACCD’s) bond construction program, the recipient of the 2015 Program Management Merit Award.
15-Jan-2015 AECOM, the global, fully integrated infrastructure services firm, has been appointed by Transport for London (TfL) to a concession contract to operate, manage and grow the Fleet Operator Recognition Scheme (FORS).
20-Jan-2015 AECOM to announce fiscal year 2015 first-quarter results on Feb. 10
28-Jan-2015 The City of Warman recently commissioned Sewage Pumping Station #8 (SPS#8), which will allow for the development of approximately 450 hectares at the north end of the City.
28-Jan-2015 Recognized for recent merger, air quality work in the Middle East, and our climate risk management and adaptation strategies.
29-Jan-2015 Upgrading an existing data centre could cost 50 percent less than a new build project and deliver the same benefits.
02-Feb-2015 AECOM’s Tishman Construction serving as construction manager for 3 World Trade Center, the next tower at the center of the World Trade Center site
02-Feb-2015 AECOM announced today that it was selected as a finalist in the 2015 PR News CSR Awards for Sustainability Report of the Year.
02-Feb-2015 The backyard invention holding up Sydney’s new structural icon.
02-Feb-2015 AECOM announced today that its Chief Executive Officer Michael S. Burke was recently named to the U.S. National Safety Council’s (NSC) 2015 list of “CEOs Who ‘Get It,’ ” which recognizes leaders who demonstrate a personal commitment to employee safety and health.
03-Feb-2015 Madelaine Fava joins AECOM’s architecture practice as Vice President and Global Sector Leader for Leisure and Culture.
04-Feb-2015 Rapid bridge replacement the key to KiwiRail’s success
04-Feb-2015 It’s been a busy awards season. Four AECOM architecture projects—all designed out of the Los Angeles Architecture Studio—were recently recognized by a number of prestigious awards programs.
05-Feb-2015 Company recognized for major industry merger, air quality improvement in the Middle East, and climate risk and adaptation strategies.
06-Feb-2015 AECOM has been appointed as one of four consulting teams that will develop the detailed plans for Crossrail 2, the proposed major new rail line that would deliver much-needed extra transport capacity in London.
06-Feb-2015 AECOM took part in the recent London Residential Property Forum, which featured key industry leaders from the Greater London Authority, Argent, Development Securities, Notting Hill Housing Trust, Haringey Council, Estates Gazette Magazine and many others.
10-Feb-2015 AECOM reports first-quarter fiscal-year 2015 results.
11-Feb-2015 Impact assessment team wins several contracts with major oil and gas clients
11-Feb-2015 AECOM announced today that it was selected as a finalist in the 2015 PR News CSR Awards competition’s “Blog” category.
17-Feb-2015 AECOM announced today that it has joined the Campbell Institute as a Charter Member.
18-Feb-2015 John Coons, AIA joins AECOM’s architecture practice as Managing Principal for the Southern California District.
19-Feb-2015 AECOM announced today that it has been named to Fortune magazine’s list of the World’s Most Admired Companies for the first time in its history.
02-Mar-2015 AECOM appoints Carla Christofferson executive vice president and general counsel
04-Mar-2015 AECOM appoints CEO Michael S. Burke as chairman of the board
05-Mar-2015 The AECOM Academy officially opened today, marking a major commitment by AECOM to train and invest in the national workforce of the Kingdom of Saudi Arabia.
05-Mar-2015 Dr Geoff Taplin, AECOM senior structural engineer, has been awarded the 2014 John Connell Gold Medal, one of the structural engineering profession’s highest accolades
06-Mar-2015 Employers must get serious about addressing gender bias in performance, talent management and pay decisions if they are to realise the business benefits that flow from increased gender equity, says Lara Poloni, AECOM’s Chief Executive – Australia New Zealand.
13-Mar-2015 Eagerly Anticipated Modern Units to Relieve Scarcity, Offer Townhome Options.
18-Mar-2015 AECOM has helped achieve the first 6 Star Green Star rating for a public building in Western Australia, and the first 6 Star Green Star – Public Building Design v1 rating in Australia, setting a new benchmark for the sustainable design of public buildings in Australia.
19-Mar-2015 AECOM is set to deliver a wide range of planning and environmental services to help communities across England develop their neighbourhood plans and shape development and growth in their local area.
23-Mar-2015 AECOM has announced that it plans to further reduce greenhouse gas (GHG) emissions across its global operations.
27-Mar-2015 AECOM’s Edward J. Schmeltz receives Lifetime Achievement Award from ASCE
Page 12 of 23