Celebrating the relocation into a refurbished industrial building designed by the company

hongkong1HONG KONG (Dec. 9, 2016) – AECOM, a premier, fully integrated global infrastructure firm, today celebrated the move of one of its offices into a refurbished industrial building in Shekou, Shenzhen. An opening ceremony was held with major business partners and local authorities attending. The new building was designed by AECOM, who turned an old industrial building into a state of the art office, an exemplary renewal project amidst the changing economy of the original industrial district.

“People should be placed at the centre of urban development and renewal,” said Sean Chiao, President of AECOM Asia Pacific. “We are extremely pleased to have been involved with a number of people-centric projects that contribute to delivering a better world. Moving into a new home where importance is placed on community development is emotionally exciting and intellectually fulfilling.”

The new AECOM office is situated at Sail Plaza, which was previously an industrial building. AECOM’s design team undertook to create a low-profile solution that retained some of the original features, such as the rectangular block and the atrium.

hongkong2Inside the AECOM office, our own architects made good use of the 15m floor to ceiling space, inserting a mezzanine layer to create a vertical interaction among colleagues beside the horizontal layout of the office. The use of wood added warmth to the cold steel window frames. There is plenty of open common space indoors for casual conversation and employee activities while a landscaped patio of more than 900 sqm and verandah provide additional amenity.

“To turn this industrial building into a high end office tower, we created a “cut through” the centre of the block,” said Wang Yimin, AECOM South China Vice President for Architecture. “This immediately converted the “dark core” into a bright one, bringing natural sunlight and a welcoming ambience into the ground floor lobby. We also retained the 15m headroom facilitating natural light and created a layout of 20 individual units on each floor of 4,000 sqm to allow maximum flexibility for potential tenants.”

As part of China’s Economic Development Focus Policy, Shekou was identified as an industrial centre in the early 1980s and attracted significant manufacturing investment.

In response to the city of Shenzhen’s maturation and changing economy, the city put together a strategy to renew Shekou from the industrial model of economic development into a modern benchmark for community development.

“Building structures are physical carriers of a city’s history,” said Ian Chung, AECOM Senior Vice President and Regional Executive, China. “We have completed a variety of city renewal projects in China with this ethos in mind. We will take this philosophy forward to ensure the development of a city stays connected with its history and in doing so continue to make this world a better place.”

About AECOM
AECOM is built to deliver a better world. We design, build, finance and operate infrastructure assets for governments, businesses and organizations in more than 150 countries. As a fully integrated firm, we connect knowledge and experience across our global network of experts to help clients solve their most complex challenges. From high-performance buildings and infrastructure, to resilient communities and environments, to stable and secure nations, our work is transformative, differentiated and vital. A Fortune 500 firm, AECOM had revenue of approximately $17.4 billion during fiscal year 2016. See how we deliver what others can only imagine at aecom.com and @AECOM.

AECOM Media Contact:
Karina Lam 林慧玲
Karina.Lam@aecom.com
+852 3922 9190

02-Jul-2012 AECOM announced today that it has been awarded two major contracts by the San Francisco Unified School District (SFUSD) that, combined, total approximately US$10 million.
09-Jul-2012 AECOM announced today that it was awarded a US$27.85-million contract to provide architecture, engineering design and production services for King Khalid Medical City in Dammam, Kingdom of Saudi Arabia.
13-Jul-2012 AECOM will release results for its fiscal year 2012 third quarter, which ended on June 30, 2012, before the opening of trading on the New York Stock Exchange on Tuesday, Aug. 7, 2012.
07-Aug-2012 AECOM announced today its financial results for the third quarter of fiscal year 2012.
13-Aug-2012 AECOM announced today that it was awarded the US$85-million construction management contract for the new Midfield Terminal Complex at Abu Dhabi International Airport.
15-Aug-2012 AECOM announced today that it will present at the Bank of America Merrill Lynch Industrials & Materials Conference on Sept. 5 and at D.A. Davidson’s Engineering & Construction Conference on Sept. 12.
23-Aug-2012 AECOM announced today that its Board of Directors has authorized the repurchase of up to $300 million of its common stock.
24-Aug-2012 AECOM announced today that South Africa-based BKS has agreed to join the company.
27-Aug-2012 AECOM announced today that KPK, a construction cost, contract and project management consultancy firm with operations across Asia, will join the company.
05-Sep-2012 AECOM announced today that it was awarded a design contract for the final leg of Anthony Henday Drive in Edmonton, Alberta, Canada.
11-Sep-2012 AECOM announced today that it was awarded a contract to provide final design services for the Denver Regional Transportation District’s (RTD) forthcoming I-225 light-rail line.
13-Sep-2012 AECOM announced today that a joint venture in which it participates has been awarded a two-year contract with the Illinois Department of Transportation for engineering studies as part of a planned major reconstruction project in the heart of Chicago.
17-Sep-2012 AECOM announced today that it has appointed Thomas Peck as senior vice president and chief information officer.
01-Oct-2012 AECOM announced today that it was awarded a final design contract to assist the Denver Regional Transportation District (RTD) in the first two segments of its North Metro Rail Line.
09-Oct-2012 AECOM was awarded an indefinite delivery/indefinite quantity (IDIQ) contract for environmental remediation services by the U.S. Naval Facilities Engineering Command (NAVFAC) Pacific.
10-Oct-2012 Perspectives from practice.
10-Oct-2012 AECOM will hold a conference call with analysts and investors on Nov. 13 to discuss fourth-quarter and full-year fiscal 2012 financial results.
23-Oct-2012 AECOM announced today that its Nov. 13 conference call with analysts and investors to discuss fourth-quarter and full-year fiscal 2012 financial results will now be held at 10 a.m. Eastern Standard Time.
23-Oct-2012 AECOM announced today that a joint venture in which it participates was awarded a multiyear contract from the Architect of the Capitol for the renovation of the Cannon House Office Building in Washington.
24-Oct-2012 AECOM announced today that it has been selected to provide general engineering consultancy services for local roads and drainage projects in the south of Qatar.
08-Nov-2012 AECOM announced today that it was awarded a contract by NASA to support architect engineering services for the Facilities Engineering Branch at the agency’s Ames Research Center in Moffett Field, California.
13-Nov-2012 AECOM today reported its financial results for the fourth quarter and full year for fiscal 2012, which ended Sept. 30, 2012.
14-Nov-2012 AECOM announced today that a joint venture in which it participates was awarded a five-year US$109-million contract by the U.S. Department of Defense to perform base operations support at the Rock Island Arsenal as well as six other locations in Illinois and Iowa.
26-Nov-2012 AECOM invites investors and other interested parties to listen to a live webcast of its presentation by senior management on Dec. 4, beginning at 6 p.m. EST, in New York.
04-Dec-2012 AECOM continues to successfully execute on its strategy for profitable growth, balanced capital allocation and disciplined financial management, John M. Dionisio, AECOM chairman and chief executive officer, will tell analysts at the company’s annual analyst event today in New York City.
03-Jan-2013 AECOM announced today that a joint venture it leads was awarded a US$43.3-million contract by the Massachusetts Department of Transportation to proceed with advanced preliminary design services, the first phase of the joint venture’s overall contract for the extension of the Massachusetts Bay Transportation Authority’s (MBTA) Green Line light rail service in Boston.
07-Jan-2013 AECOM announced today that it was awarded a US$16.8-million contract by the Metropolitan Council of the Twin Cities to perform preliminary engineering work on the Southwest Light Rail Transit line in Minneapolis.
10-Jan-2013 AECOM announced today that it has been engaged by Transmission Developers Inc. (TDI) of Albany, N.Y., as owner’s engineer for the Champlain Hudson Power Express project (CHPE).
14-Jan-2013 AECOM announced today that it has been awarded the coveted “Overall Governance, Compliance and Ethics (small to mid-cap)” in Corporate Secretary magazine’s fifth-annual Corporate Governance Awards program.
16-Jan-2013 AECOM will hold a conference call with analysts and investors on Feb. 5 to discuss first-quarter 2013 financial results.
16-Jan-2013 Company to hold conference call and webcast.
17-Jan-2013 AECOM announced today that it is working on a new 465,000-square-foot addition for Stony Brook University Medical Center’s new Medical and Research Translation (MART) Building and New Beds Support Tower on Long Island, N.Y.
24-Jan-2013 AECOM announced today that it has been awarded a US$15-million contract by the Pennsylvania Turnpike Commission (PTC) to reconstruct 4 miles of the turnpike mainline near Morgantown.
29-Jan-2013 AECOM announced today that it is one of seven companies awarded an indefinite delivery/indefinite quantity (IDIQ) contract worth up to a total of US$350 million by the United States Agency for International Development (USAID) to provide clean energy technical assistance.
31-Jan-2013 AECOM announced today that it has been selected to update the Jeddah Strategic Plan and prepare sub-regional, structural and local plans for the area.
Page 7 of 23