It looks like you're in . Would you like to see content relevant to your location?

You can change this anytime by selecting “Reset my location” in the footer.

Restoring a Lifeline: Engineering the Highway 8 Recovery 

Spences Bridge, British Columbia

Filter projects by:

Market

  • Cities

  • Commercial & Residential

    Mixed Use

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid Modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Nuclear Energy

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Governments

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Themed Entertainment and Mixed-Use

  • Oil and Gas

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

  • Transportation

    Aviation

    Bridges

    Freight Rail

    Highways & Roads

    Intelligent Transportation Systems

    Light Rail

    Mass Transit

    Ports & Marine

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Municipal Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Cost Management

  • Economics

  • Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fish Passage and Preservation 

  • Forestry, Geomatics and Remote Sensing

  • Geotechnical Services

  • International Development

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Operations and Maintenance

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Strategic Consulting

Challenge

In November 2021, an extreme atmospheric river swept across southern British Columbia following a record wildfire season, triggering catastrophic flooding and widespread infrastructure damage. Highway 8 in the Nicola Valley was among the hardest hit, with 25 sites losing at least one lane and more than seven kilometres of roadway washed away. 

As a critical corridor connecting residents, businesses, and the Nlaka’pamux Nation, the highway closure disrupted access to homes, services, and economic activity. The British Columbia Ministry of Transportation and Transit tasked AECOM and its multidisciplinary team with restoring the highway while addressing climate resilience, strict Disaster Financial Assistance Arrangements (DFAA) funding criteria, tight timelines, and the area’s significant environmental, archaeological, and cultural sensitivities.  

Solution

AECOM led a multidisciplinary design team to deliver recovery works for Projects D and E, transforming temporary emergency repairs into permanent infrastructure that met modern engineering standards while respecting corridor constraints. 

The team applied a context-sensitive, risk-informed design approach that balanced resiliency, cost effectiveness, and minimal disturbance to sensitive lands and habitats. Key measures included:

  • Reconstructing road base and pavement and refining highway geometry to improve safety
  • Modernizing drainage systems and implementing robust riprap erosion protection along the Nicola River
  • Leveraging extensive geotechnical investigations from the response phase to accelerate delivery and avoid duplication
  • Compressing multiple design stages into a single scoping deliverable, enabling advancement to detailed design and tender within five months
  • Developing corridor-specific hydrotechnical criteria based on the 2021 flood of record to strengthen performance against future extreme events

Environmental and cultural stewardship guided decision-making. Designs minimized expansion beyond the existing footprint, supported habitat offsetting and riparian restoration, and incorporated Indigenous input throughout planning and delivery. Local Indigenous participation was embedded into construction, supporting economic reconciliation and community capacity building. 

Outcome

The Highway 8 Recovery Program restored eight major washout sites and re-established a vital transportation link for Nicola Valley communities. 

Technical Results

  • Permanent reinstatement of damaged corridor sections
  • Improved roadway geometry, drainage performance, and erosion protection
  • Climate-informed designs enhancing long-term flood resilience
  • Risk-optimized geotechnical solutions meeting or exceeding pre-event conditions

Delivery performance

  • Concept to detailed design completed in five months
  • Tender ready in early 2025 with construction completed in fall 2025

Environmental and community impact

  • Reduced disturbance to undisturbed land and sensitive habitats
  • Creation of new fish habitat channels and riparian planting using native species
  • Strong Indigenous participation, including delivery of construction by a local Indigenous-owned business
  • Restored safe connectivity, economic activity, and community confidence following a major climate disaster

Together, these outcomes demonstrate how integrated engineering, collaborative delivery, and culturally informed design can rebuild critical infrastructure while strengthening resilience for the future. 

Contact for more information: 

Faisal Siddiqui, Senior Director, Highway Engineering 
Kelowna, BC 
Faisal.siddiqui@aecom.com