CN Triple Tracking for GO TRIP

Greater Toronto Area, Ontario, Canada

Filter projects by:

Market

  • Cities

  • Commercial & Residential

    Mixed Use

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid Modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Governments

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Themed Entertainment and Mixed-Use

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

  • Transportation

    Aviation

    Bridges

    Freight Rail

    Highways & Roads

    Intelligent Transportation Systems

    Mass Transit

    Ports & Marine

    Tunnels

  • Water

    Dams & Hydropower

    Industrial Water

    Municipal Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Cost Management

  • Economics

  • Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Forestry, Geomatics and Remote Sensing

  • Geotechnical Services

  • International Development

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Operations and Maintenance

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Rail Simulations

  • Strategic Consulting

AECOM was part of the $1 billion GO Transit Rail Improvement Program (GO-TRIP) in the Greater Toronto Area. Completed in 2008, the program was initiated to respond to growing demand for more passenger train service and consisted of more than 29 miles (48 kilometers) of new track, 15 interlockings, and 25 bridges, encompassing four CN subdivisions all within a densely populated, urban area.

AECOM completed the design and contract administration for numerous GO-TRIP projects, including three major corridor expansions:

Lakeshore West

  • Preliminary and detailed design and preparation of contract documents for seven miles (12 kilometers) of triple and quadruple tracking along CN’s Oakville subdivision
  • Contract administration for the track expansion and rail-carrying bridge
  • Detailed design of water main and sanitary sewer works for Halton Region
  • Environmental design for six creek crossings and one channel reconstruction

Lakeshore East

  • Detailed design and preparation of contract documents for three miles (six kilometers) of triple tracking plus three miles (six kilometers) of mainline track upgrades along CN’s Kingston subdivision
  • Preliminary design for station expansion at Scarborough
  • Contract administration for the track work and two rail-carrying bridges

Georgetown North

  • Detailed design and preparation of contract documents for eight miles (13 KM) of double and triple tracking along CN’s Halton subdivision
    Contract administration for the track expansion and four rail-carrying bridge