It looks like you're in . Would you like to see relevant content?

London Luton Airport’s expansion: building capacity for the future 

United Kingdom

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Nuclear Energy

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Our multidisciplinary experts helped secure DCO approval for the expansion of the UK’s fifth-biggest airport – setting the stage for new jobs, greater connectivity and sustainable growth. Here’s how.

Located 30 miles north of central London, London Luton Airport is one of the UK’s busiest aviation hubs – a key gateway for millions of passengers each year. 

As demand for air travel grows, London Luton Airport is preparing for its most significant transformation yet. Plans are now underway to nearly double the airport’s annual capacity to 32 million passengers by 2043, allowing its runway to be used for up to approximately 78,000 more flights per year than in 2024.  

Beyond meeting this growing demand, the expansion is expected to boost regional economic growth and strengthen the resilience of the UK’s aviation network.  

With DCO (Development Consent Order) approval granted in April 2025, the project includes a new terminal, piers and stands, airfield and landside development, and associated infrastructure improvements. 

We have been working with airport owners Luton Rising as Technical Advisor since 2017, providing multidisciplinary expertise throughout the DCO submission and examination phase. As the scheme progresses towards construction, we look forward to continuing to support the ongoing development of this nationally significant project. 

Successfully navigating the DCO process 

In the UK, all projects classed as Nationally Significant Infrastructure Projects (NSIPs) must go through the DCO application process. We’ve supported this project at every stage – from early optioneering and technical design, to environmental assessment, planning and stakeholder engagement, through to submission. 

Our team played a key role in preparing a robust, evidence-based DCO application and supporting the client through multiple rounds of consultation, legal compliance, and examination hearings. This ensured that the case for expansion was clearly demonstrated, and that environmental impacts were robustly assessed and appropriately mitigated. 

The DCO application was approved by the Secretary of State for Transport in April 2025. 

Working as one team 

To accommodate the airport’s additional capacity, the expansion will make best use of the existing runway through the phased construction of additional airside and landside infrastructure. This includes new aircraft stands, taxiways, piers and a passenger terminal to the northeast of the runway, alongside improvements to surface access and utilities. 

Given the scale of the proposed developments, the project demanded effective coordination, as well as the ability to adapt quickly in a high-pressure environment. 

From the outset, we worked as one team – bringing together specialists from across multiple disciplines including aviation, architecture, planning, environment, ground investigation, stakeholder engagement, consultation and construction. We also worked closely with teams from other consultancies, ensuring strong coordination throughout. This integrated approach meant every element of the DCO application was aligned, evidence-based, and delivered to the highest standard. 

As part of the DCO journey, we supported the evaluation of design options for the new terminal and airfield infrastructure, and delivered detailed assessments covering climate resilience, waste management, acoustics and archaeology. We also carried out strategic transport modelling to assess future network impacts and inform essential infrastructure upgrades. 

Stakeholder engagement was another key component. Our team contributed to multiple rounds of consultation – including two statutory consultations in 2019 and 2022 – ensuring that community feedback was integrated and that the DCO submission met the rigorous standards required for approval.  

During the second statutory phase, our digital experts developed a bespoke virtual consultation platform to ensure continued engagement during coronavirus restrictions. 

Our team played a key role in preparing a robust, evidence-based DCO application and supporting the client through multiple rounds of consultation, legal compliance, and examination hearings.

Balancing London Luton Airport’s expansion with environmental responsibility 

A defining feature of the project is the introduction of a groundbreaking Green Controlled Growth (GCG) framework – believed to be the “most far-reaching commitment to the sustainable operation of an airport ever put forward in the UK.”  

GCG sets limits on key environmental impacts, including noise, carbon emissions, air quality, and surface access. Monitoring will be carried out by London Luton Airport Operations Ltd (LLAOL), with results published for public scrutiny and subject to independent oversight to determine whether further growth can proceed in line with the framework. 

Our environmental specialists worked closely with Luton Rising to shape this innovative framework, helping to ensure that growth can be sustainably managed over time. 

In addition, the scheme includes wider sustainability measures, such as enhanced solar energy generation, rainwater harvesting and improvements to Wigmore Valley Park and other surrounding green spaces.  

As part of a value engineering exercise during the DCO design process, the scheme layout was revised to significantly reduce the extent of earthworks required. This redesign avoided the excavation of approximately 2,000,000 cubic metres of material – helping to reduce construction impacts and minimise disruption for nearby communities. 

Stimulating economic growth and supporting communities 

Thanks to our longstanding DCO expertise and the excellent collaboration across teams, the project is now consented and ready to move into delivery. As well as meeting future passenger demand, the expansion of London Luton Airport is designed to deliver long-term social and economic benefits.  

Not only is it set to create up to 11,000 new jobs and generate around £1.5 billion in additional economic activity each year, but it will also deliver up to an additional £13 million annually on top of Luton Rising’s already class-leading social investment – supporting local communities, charities and wider regeneration efforts across the region.