-
100 Resilient Cities
-
Adolfo Suarez Madrid-Barajas Airport
-
Blackpool Seafront
-
Charles W. Cullen Bridge at the Indian River Inlet
-
Clough Undergraduate Learning Center
-
Crossrail
-
Dow Chemical Company – Environmental Master Services Agreement
-
Fillmore Water Recycling Plant
-
Flanagan South Pipeline
-
Halley VI Research Station
-
High Speed Two – HS2
-
I-595 Express Highway
-
Inner Doha Re-sewerage Implementation Scheme (IDRIS)
-
Jinji Lake Waterfront
-
La Jolla Commons Office Tower
-
London Gateway
-
Low Level Waste Repository
-
Marina Bay and Greater Southern Waterfront
-
NASA Langley Research Center – Headquarters Building
-
Ocean Beach Master Plan
-
Ottawa Light Rail Transit
-
Pearl Harbor Memorial Bridge (Q Bridge)
-
Port Botany Expansion
-
Queensland Rail, Goonyella to Abbot Point Expansion Project
-
Redevelopment of Former Crop Protection Manufacturing Site
-
Roseisle Distillery
-
Royal Victoria Hospital Critical Care Centre
-
Seattle First Hill Streetcar
-
Siemens Schaltwerk
-
Silver Line Bus Rapid Transit, Massachusetts Bay Transportation Authority
-
Stirling Calico Solar
-
Sydney Tar Ponds
-
The Ruma
-
Titanic Belfast
-
Water and Environment Management (WEM) Framework
-
7-Eleven
-
A32 Shannaragh Realignment
-
Adaptation Planning for Sea Level Rise at Australian Defence Sites
-
Appalachian Basin Oil & Gas Program
-
Army Aviation Centre Oakey (AACO)
-
Arpechim refinery lakes remediation
-
Asset Management Customer Value
-
Audi Brussels Environmental Remediation
-
Baja Liquefied Natural Gas Plant
-
Beijing World Financial Center Sustainability Consultancy
-
Beijing Yanqi Lake International Conference Resort
-
Bloom Lake Mine to Port Railway
-
Blue Gate Antwerp Remediation Strategy
-
Bruckner-Sheridan Expressway
-
Calnev Pipeline Expansion
-
Cedar Creek Wind Farm
-
Choose How You Move Personal Travel Planning
-
Chromium clean-up project
-
Colombo South Container Terminal
-
Deer Island Wastewater Treatment Facilities
-
Department of Defence Biofouling Study
-
Department of Lands and Planning
-
Design and Construction of a State of the Art Quarry Landfill
-
Deutsche Bank Taunusanlage
-
Due Diligence for Logistic Sites across Europe
-
E-470 Toll Road, Segment IV
-
East Sitra
-
Electrical Resistance Heating Remediation Project
-
Environmental Site Assessments, Risk Analysis and Preliminary Remediation Plan
-
EURUS Juchitán Wind Park
-
Falcon to Gonder 345 kV Transmission Line EIS
-
Field Study of Methane Emissions Measurements from the Oil & Gas Industry
-
Former Training College, Fiskville
-
Formosa Oil Gas Stations Soil and Groundwater Remediation
-
Gap Analysis, Investigation, Remedial Planning
-
Gas TransBoliviano Natural Gas Pipeline
-
Gateway West
-
GME Dock Expansion
-
Grängesberg Iron Ore Complex
-
Harbor Bridge
-
Highway 407 East Completion Preliminary Design, Western Section, Brock Road to Ashburn Road
-
Howe Sound Remediation
-
Hydro dam hazard studies
-
INPEX Browse Ichthys Gas Field Development
-
ITC Grand Chola
-
Jeddah City Plans
-
Jönköping Airport
-
Kai Tak Cruise Terminal
-
Kaohsiung City Zoo Planning
-
Kaohsiung Linhai Special Industrial Park Air Quality Monitoring System
-
Kilkenny Pedestrian and Cycle Bridge
-
Kö-Bogen
-
Kuwait Oil Company Air Compliance Management
-
Laajasalo Oil Storage Cavern Remediation
-
LitPol Link Power Transmission Line
-
Liverpool Central Library
-
Location and Permitting Due Diligences
-
Los Angeles Police Department Headquarters
-
M1 Junctions 10 – 13 Smart Motorway
-
Maldives Coral Restoration
-
Manchester Town Hall Complex Transformation Programme
-
Mattala Rajapaksa International Airport
-
Mersey Gateway
-
Minneapolis Children’s Hospitals
-
Motiva Port Arthur Refinery
-
Motorway Sub-Section Bilješevo-Kakanj
-
North Glasgow Integrated Water Management System
-
Odra River Basin Flood Protection
-
Oil spill environmental and social sensitivity atlases
-
Olsztyn Bypass
-
One Central Park
-
Orchard Park
-
Pacific Hydro Portland Wind Energy
-
Panama Canal Atlantic Crossing Feasibility Study
-
Park Nicollet – Heart and Vascular Center
-
Petrom waste treatment and removal
-
Pleasant Hill Road over I-85 Diverging Diamond Interchange
-
Port of Rotterdam Container Terminal EHSDDA
-
Project Sandcastle
-
Prysmian Group HSE support
-
Purari Hydropower Scheme
-
Quadrant:MK
-
RAAF Base Williamtown
-
Racibórz Dry Polder
-
Rebuild by Design: Meadowlands
-
Reef Island Development
-
Regional Connector Transit Project
-
Remediation of Contaminated Sediments
-
Resilient by Design Bay Area Challenge
-
Riberas del Pantepec Port Terminal
-
Rolls Royce Facilities
-
Roof Renewal for Wilson Bus Garage
-
S8 Expressway
-
Salvation Army Kroc Center Brownfield Redevelopment
-
Santos Gladstone Liquefied Natural Gas
-
ScottishPower – Sustainability Services
-
Shell Stornes Tank Depot
-
Siu Ho Wan Sewage Treatment
-
Soekarno-Hatta International Airport Express Rail Link – Pre-Feasibility Study
-
Soil and Groundwater Investigation for Chemical Company
-
Southampton Flood and Coastal Erosion Risk Management Strategy
-
SR-91 Corridor Improvements
-
Summit Street Improvements
-
Sustainability Focus: Diversification Économique (DIVECO2), Algeria
-
Sustainability Focus: Envisioning a Better Nanjing, China
-
Sustainability Focus: Highways England
-
Sustainability Focus: Mount Tom Solar Farm
-
Sustainability Focus: Urban Sustainability Directors Network (USDN) Climate Change Preparedness Toolkit
-
Swanston Academic Building
-
Sydney’s Convention, Exhibition and Entertainment Precinct
-
Tajiguas Resource Recovery Project
-
Tata Steel Direct Shipping Ore
-
The Vitry-sur-Seine Research, Development and Production Platform
-
Tianjin TEDA Modern Service District Development and H2 Demo Green Building
-
Transport Sector PFAS Study
-
Understanding the Impacts of Climate Change on an Electric Distribution Utility in Canada
-
Warsaw Railway Node
-
Watershed-based Preliminary Site Investigation
-
Weather Channel Studio Addition
-
Wenying Lake
-
Yavuz Sultan Selim Bridge and Northern Marmara Motorway