A Roadmap to Central Plant Decarbonization at the University of California, Riverside

California, United States

Filter projects by:

Market

  • Chemicals

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Battery Energy Storage Systems

    Biomass

    Carbon capture utilization and storage

    EV charging

    Geothermal

    Heat pumps

    Hydrogen

    Hydropower

    Natural gas

    Nuclear Energy

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transmission and distribution

    Transportation decarbonization

    Wind

  • Healthcare

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Buildings & Infrastructure

    Civil Works

    Disaster Resilience

    Energy

    Environment

    International Development

  • Oil and gas

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    Cultural Resources and Heritage Management 

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • Chinese Mainland

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

  • Zambia

Campus Decarbonization at University of California Riverside.

The development of a roadmap for the University of California Riverside (UCR) campus to achieve its decarbonization goals. A key strategy to reduce on-campus emissions was replacing traditional steam heating with a high-efficiency, electrified, low-carbon hot water network.

In alignment with the latest University of California climate action goals, UCR commissioned a campus decarbonization study, the objective of which was to identify pathways to transition away from on-campus fossil fuel use, reducing associated greenhouse gas emissions by 90% by 2045.

Developed by our energy planning team, the roadmap charts a transition from a 70-year-old, emission-heavy steam infrastructure to a low-temperature hot water system powered by heat recovery chillers, air source heat pumps, and thermal energy storage. The plan not only supports a 90% reduction in Scope 1 emissions but also prioritizes infrastructure resilience, cost-efficiency, and equity. With a flexible phasing strategy and alignment to institutional goals, UCR is setting a new benchmark for campus energy transformation — one that balances technical ambition with operational realities and long-term climate leadership.

A next-generation energy model for higher education

University of California Riverside’s path to decarbonization began with a critical look at its energy infrastructure and connected buildings. The campus relies on an ageing steam network, with steam generated at a central utility plant and distributed across university buildings. While still operating effectively, the centralized system poses challenges in maintenance, energy performance, and emissions control. Steam boilers, distributed boilers, and kitchen equipment account for nearly 90% of UCR’s Scope 1 emissions.

Our energy planning team conducted building audits to assess existing building system performance and develop solutions for an energy system transition. From there, we developed a model of the campus energy network to appraise the operational and economical feasibility of possible solutions, including alternate configurations of the existing steam network, decentralized building systems, and alternative fuels (e.g., hydrogen).

Our proposed solution focused on replacing UCR’s aging steam system with a low-temperature hot water network, which enables the use of high-efficiency centralized heat pumps. For the campus buildings currently served by the existing district steam network, we recommended upgrades to coils, piping, and controls for hot water compatibility. For process loads on campus, localized electric equivalents were proposed, with associated electrical infrastructure improvements.

Minimizing disruption, maximizing resilience

Minimizing disruption to daily campus life was a core priority throughout the decarbonization effort. We developed a five-phase implementation plan that ensured continuity of service throughout the planned energy transition. Plans included temporary boiler systems to maintain heating and cooling as upgrades progressed. By leveraging the existing utility corridors, which cover roughly 70% of the hot water distribution network, major intrusions into campus operations could be avoided.

Addressing infrastructure resilience was equally essential. Our team worked closely with Riverside Public Utilities to identify limits of grid capacity and reduce the single-point-of-failure risk at UCR’s main electrical substation. Proposed system enhancements included the integration of thermal energy storage and heat recovery chillers, providing greater energy efficiency and operational flexibility across the campus.

The roadmap also emphasized equity – embedding metrics of environmental justice into the technical analysis to ensure a fair and inclusive energy transition.

Today, UCR is putting the plan into action. The Satellite Plant is being expanded to optimize phasing, and design is underway to convert the first two of eleven steam-reliant buildings to hot water systems. Decarbonization is now an institutional priority, with three of the university’s top 20 Facilities Services goals directly supporting the transition, reflecting UCR’s campus-wide commitment to a resilient, low-carbon future.

Figure 1: Scenario performance scorecard

Planning for long-term impact

Our collaboration with UCR continues as we explore near-term pilot projects for decarbonized heating systems and work closely with university leadership to identify funding pathways. This ongoing partnership ensures UCR is not only implementing a new system but also building the capacity to sustain and evolve its decarbonization strategy independently.

Figure 2: Implementation timeline summary

Our roadmap combined AECOM’s strategic energy planning expertise with UCR’s deep campus operational knowledge, resulting in a plan that is both technically robust and tailored to the university’s unique needs. It also includes a flexible phasing strategy designed to adapt to shifting project timelines, emerging technologies, and future campus growth.

By integrating local insights with proven decarbonization strategies, we empowered UCR to take ownership of their long-term sustainability goals. As a result, the university is now well-positioned to lead the way in sustainable campus transformation, demonstrating how thoughtful planning, flexible implementation, and strong partnerships in achieving lasting change.