Ford Australia Decommissioning Program

Australia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

AECOM was appointed in July 2017 as Program Manager by the Ford Motor Company (Australia) to manage the decommissioning, deconstruction and selective demolition of its three manufacturing facilities in Victoria and to prepare them for future sale and re-use. AECOM’s responsibilities include project management of the three Sites as an integrated program of work including, safety, environmental, engineering, commercial, contracts, stakeholder and project controls functions.

As part of this integrated delivery, one discrete and critical element completed by the Program team was the decommissioning, deconstruction, packaging and loadout of the newest of Ford’s manufacturing lines comprising three by 1,000t and two by 2,400t Fagor stamping presses complete with associated automation and press line infrastructure. The equipment had to be disassembled, catalogued, preserved and packaged in such a way that it could be reconfigured and reconstructed by another automotive manufacturer in Europe seamlessly and within strict time constraints.

Early attempts to contract these works had broken down, however AECOM identified alternative, suitable contractors and ran a rapid engagement prequalification, evaluation process and supported negotiations to lock in a new contractor within a very short time frame. AECOM worked collaboratively with Ford and:

  • Managed the fluidity of the situation professionally and protected Ford’s interests every step of the way;
  • Leveraged strong contractor relationships to resolve disputes and keep the works progressing, despite some significant commercial impediments;
  • Navigated constantly changing and evolving technical and commercial requirements; and
  • Monitored the schedule and pushed hard to mitigate the risks, resulting in a successful completion of the project.

AECOM’s leadership ensured that works where progressed in accordance with the Buyer’s quality and schedule requirements to ensure the sale was secured for the benefit of Ford, who was delighted with our performance, as evidenced by the following:

“As the project manager, the AECOM team worked closely with the Ford team on all aspects of the project, including procuring a contractor in a short time frame. There were numerous challenges the team faced … and our teams lived our values including always being safety risk wary…, being issue focussed, adopting a team approach to resolution, [being] just and fair, resilience, and develop[ing] a positive learning culture to drive continuous improvement. Significant thanks and well done to the AECOM team for their commitment and to living our values.”

Ford Australia’s Operations Director