AECOM Hunt is serving as CM for this design and construction of a new Terminal 6 (Phase 1), and the demolition, design, and construction of Terminal 7 (to be then an extension of Terminal 6).
The roughly 5-year project involves the construction of a new 1,100,000-SF, three-story terminal, 706,000 SF of apron, and associated roadways.