Woodrow Wilson Bridge

District of Columbia, United States

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

The $2.35 billion Woodrow Wilson Bridge Project was featured on the Discovery Channel’s Extreme Engineering Series and was termed “the world’s largest drawbridge.” The Project has received over 70 major awards, including ASCE’s Opal Award, and has been referred as ‘Washington DC’s Newest Monument’ which has successfully eliminated the worst traffic bottle neck on Interstate 95 between Maine and Florida. At its peak, the Project employed 1,400 workers on site and executed over $1 million worth of work every day. Planning started in the 1980s, the signature design was selected in 1998, construction began in 2000, the Potomac River bridges were open to traffic by 2008, and the major interchange work was complete by 2014.

AECOM was a joint venture partner serving as general engineering consultant for the program. The project comprised a 7.5-mile project corridor located on the Capital Beltway (I-95/I-495) connecting 200,000 vehicles per day to Maryland, Washington DC and Virginia. The new bridge features pre-cast, post-tensioned segmental fixed spans and four parallel drawbridges, totaling 12 lanes with accommodation for pedestrians/bicyclists and future rail transit. The landside work included the complete reconstruction and expansion of four major Capital Beltway interchanges including MD210, I-295, US1 and the Telegraph Road interchange along with the reconstruction of Jones Point Park under the Virginia side of the new bridge.

The award winning environmental program included the following highlights:

  • Development of a beneficial-use dredged material placement facility to accept 500,000CY of dredged material from the project to restore 50 acres of abandoned strip mine to highly productive agricultural land.
  • Development and implementation of a contained air bubble curtain system which protected sensitive fish species during driving of 1,000 massive steel pipe piles up to 72” in diameter and 210 feet long.
  • Protection of a bald eagles nest with the construction zone. The eagles successfully hatched and fledged 16 carefully-observed eaglets during the course of construction.
  • Implementation of a fish reef creation program that delivered 52 barge loads totaling 65,000 tons of concrete debris from the old bridge demolition to create five major high-value fish reefs in the Chesapeake Bay.
  • Implemented the $25 million mitigation program including underwater grass bed planting, fishery restocking, stream restoration, fish ladder construction, wetland restoration, and reforestation.

AECOM and the GEC Team resolved many major challenges including facilitation of four owners (MSHA, VDOT, DDOT and FHWA) and over 30 regulatory and resource agencies; managing five separate segment designers (main bridge and 4 interchanges) simultaneously; and resolving a high, single bid on the bridge superstructure contract. Amazingly, over the course of 15 years of design and construction, the cost of the project was actually reduced by $86 million from the original estimate of $2.44 billion to the final cost of $2.35 billion, thanks to diligent program management and cost control by AECOM and our partners.