Suzhou Olympic Sports Centre

Suzhou, China

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Centrally located in Suzhou Industrial Park, the Suzhou Olympic Sports Centre (SZOSC) is a large-scale project with site area of approximately 60 hectares and GFA of 360, 000 square meters.

It is comprised of five facilities on a single campus, including a 45,000-capacity stadium, a 13,000-seater indoor arena, an international-standard swimming complex, an athletics track and training center, and a 17-floor commercial building with 4-floor podiums and basement carpark. It is the only facility of its kind in Suzhou and the country’s first garden-like sports complex and first ecological sports park applying smart management technologies, engaging the community and citizens of Suzhou in daily activities.

With their curved roofs, the buildings form a distinct ensemble and a new center of that part of the city. For the very first time in China, a single-skin cable network roof construction has been used to cover the large sports buildings, which also put forward high requirements for construction. As the construction management supervisor of this project, AECOM led the participating units in a lean management approach and broke through various technical difficulties encountered in the construction.

It is worth mentioning that QR code was innovatively applied in the construction management. From every work link to each construction material, were all equipped with a specific QR code. After scanning, we could know the specific implementation party, construction party, material use and quality control situation, making the whole management process more scientific and informationized.

In addition, the whole project lasted for over 1300 construction days, and during the peak time, 4,500+ workers from 20+ different contractors worked on site amidst lots of high hazardous works. However, under AECOM’s management, the SZOSC Project achieved a record of 20 million working hours without serious incidents. The key in safety success was the approach of “Caring people” and “Nine Life Principles” which made us stand out from the industry. AECOM team systematically implemented a series of safety measures, such as pre-planning, various risk analysis, safety trainings, safety inspections, safety meetings, serious unsafe issues rectification meetings, safety performance reviews, emergency response plan development and drills, implementation of rewards and punishments scheme, and always committed to providing a good life entertainment environment for construction workers to relieve physical and mental fatigue. On the project, every one of our team was responsible for safety, and by strictly implementing our “Nine Life Principles”, we have achieved the amazing safety record and won full respect and trust from the client, contractors and the government.

So far, this project has won many awards and become a role model in safety management in Jiangsu Province, China’s second largest economy. We have hosted many visits and studies by peers, which inspires to elevate the safety management standard of the whole industry. At the end of 2019, the stadium project won the Luban Prize, the highest award in the field of the quality of construction engineering in China, and the commercial plaza project has passed the selection of National Quality Engineering Award.

Awards

  • Safety Model Project of Jiangsu Civilized Construction Award
  • Model Project of National Green Construction Award
  • 2018-2019 China Construction Engineering Luban Prize (National Quality Project)