Purari Hydropower Project

Papua New Guinea

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

PNG Energy Developments Limited (PNG EDL), a 50/50 joint venture of the PNG Sustainable Development Program (PNGSDP) and Origin Energy Ltd of Australia, evaluated the potential development of a renewable hydropower project on the Purari River in Papua New Guinea (PNG).

The renewable hydropower project was being investigated within the Purari River catchment in Gulf Province, PNG, approximately 350 kms NW of Port
Moresby. If proven feasible, the project could provide electricity for local and industrial purposes in PNG. It could also deliver electricity to Australia by an undersea transmission cable.

A consortium led by AECOM, comprising Electricité de France, Environmental Resources Management Australia Pty Ltd and Entura (Hydro Electric Corporation of  Tasmania), was engaged by PNG EDL, to undertake the project feasibility studies and social and environmental impact assessments for the proposed hydropower development.

Investigations confirmed that a hydropower scheme on the Purari River with a generating capacity in excess of 2,000 Megawatts (MW) is technically feasible. The feasibility study included investigating a number of potential dam locations within the Purari River catchments and the accompanying electrical
transmission infrastructure to deliver the electricity to PNG and into the Queensland grid.

The proposed hydropower scheme involves the development of a power station and associated transmission lines and cables. Options for the transport of power from the power station included an overhead transmission line to the PNG Coast, undersea transmission cables to Daru and across the Torres Strait to the Australian coast at Cape York, Queensland, and an overland transmission line down Cape York to connect to the Australian grid, near Townsville. If constructed, the undersea section of cable would be one of the longest High Voltage Direct Current (HVDC) undersea cables ever built.

Our Approach

An integrated management approach with close co-ordination between the engineering, environmental and social impact assessment teams was adopted for all studies. This ensured the engineering design and operating aspects were developed with consideration of critical social and environmental factors.  This approach enabled mitigation of social and environmental impacts identified during the studies through scheme selection and design where possible and the subsequent development of management plans to minimise impacts where unavoidable.

Value add 

  • Our leadership team had a comprehensive understanding of the client and JV partners health and safety requirements and values as well as a strong under understanding of challenges associated with remote work considerations.
  • A global, integrated team was established, incorporating four organisations spread over six global locations, with the use of local sub-consultant experience in PNG, ensuring the best technical expertise for the project and client.