It looks like you're in . Would you like to see relevant content?

Supporting Australia’s most advanced offshore wind farm

Victoria, Australia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Nuclear Energy

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

We’re providing planning and advisory services for the Star of the South (SOTS) project, Australia’s most advanced offshore wind farm.

Next generation power solution

SOTS is an offshore wind project proposed off the coast of Gippsland, Victoria. The project is progressing under a feasibility licence across a 586 km² area, located approximately 10 km from the coast at its closest point.

SOTS could include up to 150 turbines, and at full capacity, it has the potential to generate up to 2.2 GW of electricity, enough to power around 1.2 million homes across Victoria. The project is also expected to create up to 6,000 Australian jobs over its lifetime and deliver billions in local investment. Leading the approvals process

The construction, operation and decommissioning of the wind farm is subject to comprehensive environmental and planning assessment, approval, and licensing processes. In 2019, AECOM was engaged as the lead approvals consultant to support the project’s development. Working closely with regulatory agencies, we led the development of the approvals strategy, including the adoption of a project design envelope approach through impact assessment.

We are also preparing the Environment Effects Statement (EES) and Environmental Impact Statement (EIS) documentation, helping to ensure the project meets environmental requirements and community expectations.

Our work so far has included collecting environmental data to inform environmental impact assessments, incorporating feedback from the stakeholders into project planning, and supporting the development of the underground cable connection to the proposed VicGrid hub, in collaboration with landholders along the route.

We have also undertaken studies that informed key design decisions aimed at reducing environmental impact. These include avoiding high-profile reefs on the seafloor and using a no-trench construction method where cables come to shore to protect the beach and dunes above. Additionally, we provided bird flight height data that contributed to increasing the clearance between the ocean surface and turbine blades from 25 to 35 metres, helping to create a safer zone for seabirds to fly and forage.

A clear pathway forward

Our work is helping to establish a clear pathway for the project to obtain the required planning and environmental approvals. This is enabling SOTS to actively manage approvals risks and continue progressing with greater confidence.

Environmental and planning assessments are ongoing and are expected to conclude in 2026. Subject to approvals, construction could begin later this decade, with first power targeted around 2030, supporting Victoria’s goal of 2 GW of offshore wind by 2032.