It looks like you're in . Would you like to see content relevant to your location?

Controlling groundwater contamination at a former industrial site in northern Italy 

Italy

Filter projects by:

Market

  • Chemicals

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • District energy systems 

  • Education

    Colleges & Universities

    Schools

  • Energy

    Battery Energy Storage Systems

    Biomass

    Carbon capture utilization and storage

    EV charging

    Geothermal

    Heat pumps

    Hydrogen

    Hydropower

    Natural gas

    Nuclear

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transmission and distribution

    Transportation decarbonization

    Wind

  • Healthcare

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Buildings & Infrastructure

    Civil Works

    Disaster Resilience

    Energy

    Environment

    International Development

  • Oil and gas

  • PFAS

    PFAS Advise and Manage 

    PFAS Investigate and Analyze  

    PFAS Prevent and Control  

    PFAS Treat and Eliminate  

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transit Bus and Bus Rapid Transit (BRT) 

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    High-speed rail 

    Highways & Roads

    Light Rail

    Mass Transit

    Ports and Maritime

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Advisory

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Resilience and Adaptation  

    Cultural Resources and Heritage Management 

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • Chinese Mainland

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

  • Zambia

Learn how we delivered a tailored containment barrier at a complex riverside site in northern Italy, helping control contaminated groundwater and support long‑term remediation.

In northern Italy, a former chemical production site faced a serious environmental legacy. Groundwater beneath the site had been contaminated by benzotrifluoride (BTF) and per- and polyfluoroalkyl substances (PFAS), posing a major risk of pollution spreading beyond its boundary. 

Working for an international oil and gas company, we were appointed as engineering, procurement and construction (EPC) contractor. Our role was to deliver a continuous physical barrier along the upgradient side of the site, where groundwater flows in, to help control and reduce contamination. 

The project brought together multiple technical disciplines – hydraulic modelling, geological study, geotechnical analysis and remediation design – to develop a containment strategy tailored to the site’s complex environmental and ground conditions. 

Over a 24-month programme, we supervised and coordinated complex civil and geotechnical works, helping our client take a critical step forward in its remediation strategy.

The challenge 

Due to the location of the site alongside a creek, controlling groundwater was particularly challenging. 

The local hydrological system is influenced by rainfall from the surrounding hills, water from the adjacent river, and natural groundwater recharge. As a result, groundwater levels and flow can vary, increasing the risk that contamination could spread beyond the site boundary unless it is carefully contained. 

To prevent this, a physical barrier was required along the edge of the site. It also needed to extend deep enough to reach naturally less permeable clay and limestone layers. Without this depth, groundwater could flow beneath the structure, reducing its effectiveness.  

The setting and geology added further complexity. Around 80 per cent of the works took place within the creek corridor itself. Water levels rise and fall throughout the year, and heavy rainfall can quickly increase river depth. Construction therefore had to be meticulously planned and sequenced to maintain safety, protect the watercourse and keep the programme on track.  

Building a robust containment barrier  

To meet these challenges, we led the delivery of the physical barrier designed specifically for the site. 

The scheme included: 

  • A 480-metre steel sheet pile wall with a max depth of 15 metre, covering around 5,500 square metres 
  • A 100-metre secant pile wall with a max depth of 22 metre, covering around 1,800 square metres 
  • Approximately 4,000 square metres of riverbank capping works 

Together, these formed a continuous underground barrier along the upgradient site perimeter. 

As ground conditions varied across the site, we adapted installation methods accordingly. Steel sheet piles were installed where the ground allowed. In areas with harder soils and rock, relief drilling (pre-drilling to ease installation in dense ground) made it possible to install the sheet piles correctly. Elsewhere, overlapping concrete piles created a solid underground wall capable of reaching the required depth. 

Along the creek, the capping system prevents river water from entering the site, helping reduce groundwater recharge in this sensitive area. 

Delivering these works within a live creek environment required careful planning. We installed light working platforms to allow safe site operations while minimising disturbance to the riverbed and surrounding habitat. 

Close collaboration between our environmental and civil engineering teams made sure environmental requirements were embedded in construction planning.

Ensuring safe and controlled delivery on site 

As EPC contractor, we were responsible for delivering the containment works safely and effectively. 

Our role included: 

  • Daily supervision of site activities 
  • Management of specialist subcontractors 
  • Coordination of civil and ground engineering works 
  • Technical oversight and quality assurance 
  • Close collaboration with the legally appointed safety coordinator 

We maintained a continuous presence on site throughout the 24-month construction period. This allowed us to respond quickly to changing river conditions, manage programme risks, and ensure environmental protection measures always remained in place.  

Close collaboration between our environmental and civil engineering teams made sure environmental requirements were embedded in construction planning. 

We also oversaw the testing of the completed barrier to confirm it met the required performance standards. 

Safeguarding groundwater and managing environmental legacy 

Now completed, the barrier significantly reduces the amount of groundwater entering the site. This supports the hydraulic pumping system and helps prevent contamination from spreading beyond the site boundary. 

By containing contamination at source and protecting the adjacent creek corridor, the project is supporting long-term environmental protection and helping create the stable groundwater conditions needed for the next phase of remediation.