Fortitude Valley State Secondary College

Queensland, Australia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Construction of Brisbane’s first vertical State school

The Queensland Department of Education is seeking to address projected school enrolment numbers in Brisbane’s inner Northern suburbs and Fortitude Valley State Secondary College was the first of two vertical schools developed to help address growing demand, the other being in Dutton Park.

Fortitude Valley State Secondary College, Brisbane’s first vertical State school, uses a vertical design to capitalise on its inner-city lot. With state-of-the-art education facilities, including ‘future focused’ learning areas such as an Innovation Hub and multidisciplinary, high tech labs and workshops, the school will create spaces which can be reconceptualised and activated in flexible ways to foster student and staff engagement, partnerships, community engagement and highly personalised learning.

As part of the winning consortia led by COX Architects, AECOM undertook all building services including mechanical, electrical, communication and security, hydraulics, fire protection and acoustics.

The project aimed to produce a design that:

  • Creates a school of the future, to enable students to become problem solvers, critical and creative thinkers.
  • Fosters innovation, enabling students to think beyond current solutions.
  • Provides successful senior schooling pathways to further learning and work.
  • Partners with business, industry, universities, families, and communities to support student learning; and
  • Values and supports our teachers and educators.

The project was delivered as an extension of the sterling team ethos Cox and AECOM fostered on the successful Adelaide Botanic High School, a $100M vertical school and the first of its kind in South Australia.

Services

  • Mechanical Engineering
  • Electrical Engineering
  • Communications and Security
  • Hydraulics
  • Fire Protection
  • Acoustics
  • Vertical Transportation
  • Air Quality

Achievements

AECOM worked closely with the client, user groups and the design team from the early stages of planning to address the site constraints which drove the facility towards a vertical solution. This meant that the engineering outcomes would need to be more advanced than a typical low-rise school in Queensland. AECOM assisted the DOE in understanding the impact that would have on the reliability, cost, maintenance and occupant conditions.

The movement of students between floors was an important issue for DOE. The key was finding the balance between providing a lift solution, that catered for movement over a number of floors, and encouraging use of the large central stair where possible for movement over just one or two floors.

An obstacle for the development was the proximity to an existing rail line and a busy city road junction. Extensive acoustic modelling was required to determine how the school would operate in natural ventilation mode, which had to account for the intermittent rail noise to be balanced against a continuous noise source from the adjacent road junction.

The secondary issue related to location was air quality, which our Environment team undertook comprehensive testing for to determine where openable windows could be allowed and the requirements of the mechanical systems for outside air intakes.

Finally, the Performing Arts space was originally required to function for school productions and have some adaptability to allow more than one space to be used at a time. The building was then further developed to allow the space to be used as classrooms should the need arise for capacity reasons. This ended up being utilised when the school looked to take part occupancy of the site while the main building was completed.