M80 Upgrade Sydney Road to Edgars Road

Victoria, Australia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Environment

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

The M80 Upgrade between Sydney Road and Edgars Road involved the upgrade of approximately four kilometres of the freeway.  The project included widening the freeway to three through lanes in each direction as well as improving the interchanges at Sydney Road and Edgars Road and providing a system interchange with connections in each direction to M31 Hume Freeway.

Project summary

The project included the upgrade of existing ramps by increasing the ramp lengths and providing ramp metering and braided ramps between the M31 Hume freeway and Edgars Road. It also included improvements for right-turning traffic from Edgars Road to M80 Greensborough-bound by adding an additional right-turn lane.

Services

AECOM was responsible for the detailed design and documentation of the following:

  • Two new super T bridges and strengthening of two existing super T bridges;
  • Extension to the existing cable-stay pedestrian bridge at Blaxland Avenue;
  • Retaining walls and gantries;
  • Geometric road widening and associated road furniture and barriers; and
  • Road drainage and pavement details.

Achievements

  • AECOM’s detailed design delivery contributed to the project being completed a year ahead of schedule. This was enabled by the retention of existing road and drainage infrastructure and noise attenuating walls.
  • Developing an innovative solution that supported offline construction.
  • Retaining existing infrastructure also minimised impacts on the local community and road users.
  • Understanding our clients and the transport industry, AECOM optioneered concept designs for this section of the M80 Upgrade and engaged with our contracting client early for constructability feedback. Therefore, when the tender documentation was released, AECOM was able to quickly set to work and develop a more mature and innovative alternate solution. This alternative solution provided significant operational benefits for MRPV and construction benefits for our contracting client.
  • AECOM design presented an alternate engineering solution to retain the existing Blaxland Avenue pedestrian bridge, an architecturally pleasing cable-stay bridge. This solution mitigated the reference design solution to provide a truss pedestrian bridge.
  • Early survey input of the existing drainage network enabled AECOM to develop a drainage design solution that retained significant lengths of the existing pipe, mitigating the need to trench through existing pavement to install the new pipe. This solution also supported project sustainability outcomes.