Melbourne Airport T2 Arrivals Hall Redevelopment

Melbourne, Victoria, Australia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Environment

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges & Tunnels

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Melbourne Airport’s Terminal 2 (T2) Arrivals Hall redevelopment is an important milestone in delivering an improved arrivals experience for inbound international passengers, whilst also catering for future growth in passenger numbers.

This significant project includes the expansion of the building footprint at Arrivals (ground) level, enhanced connectivity between T2 and the Domestic terminals via new vertical transportation and a new central exit point for arriving passengers from Customs and Baggage Reclaim.

An increased level of service contributes to the overall passenger journey with improved amenities and retail facilities. The development also provides additional capacity for people waiting to greet their loved ones, including much more seating and space.

A key design feature is the new expanded modern façade, which unifies the front door to the Airport providing new entrance portals to both T2 and T3. This design solution provides the redeveloped Arrivals Hall with increased natural light into the expanded floor plate.

Delivering the redevelopment in an operational airport environment and dealing with the ever-changing conditions of a global pandemic, AECOM worked closely with the consultant team, our client and the contractor to deliver the project through detailed staged works limiting impact on operations. By being agile and adapting to new ways of working, AECOM supported the continued delivery of works on site for Melbourne Airport.

Key Challenges

A key challenge of the project was the expansion of the hall into the forecourt area, requiring the accommodation of the existing elevated roadway structure into the redeveloped building envelope. AECOM undertook significant analysis of the existing roadway structure to determine the opportunity to support additional loads from the 50-year old structure. As a result, the requirement to provide an additional layer of structure beneath the existing road structure was removed. This maximised the ceiling height to the Arrivals Hall, increasing natural light penetration.

AECOM’s approach to digital delivery further mitigated project risks in this area by undertaking increased modelling and coordination of both existing and new in-ceiling services in the early design phases to validate the ceiling design concepts and spatial planning.

This approach extended to addressing the significant existing in-ground service constraints on the project with our team drawing on our detailed understanding of Melbourne Airport and its infrastructure. This enabled us to avoid the relocation of critical incoming services without comprising project outcomes, increasing value and reducing risks for APAM.

Our multi-discipline delivery team worked closely with the APAM stakeholder groups to develop a holistic design response that considered whole-of-life and operational requirements, minimised impacts to the daily operation of the Airport and passenger movements as well as providing future-proofed outcomes considerate of the Airport’s Masterplan for further expansion.