North Auckland Line Recovery: Environmental & Ecological Management

New Zealand | Aotearoa

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

In early 2023, New Zealand experienced two severe weather events: the Auckland Anniversary Floods and Cyclone Gabrielle, which caused extensive damage across the North Island. The North Auckland (Rail) Line, a 200km rail connection between Swanson, Auckland and Whangārei and the sole rail route into Northland, was significantly impacted, with more than 200 damaged sites identified. To accelerate the recovery, the Government enacted the Severe Weather Emergency Recovery Legislation Act (SWERL) 2023, bypassing the usual consenting requirements under the Resource Management Act 1991. Under the SWERL Act, KiwiRail received a Severe Weather Emergency Recovery Order to enable the repair and revitalisation of the North Auckland Line. KiwiRail engaged AECOM in an environmental management role to help them understand the Severe Weather Emergency Recovery Order requirements, which amended the standard RMA consenting process and had not been implemented previously. AECOM worked closely with KiwiRail to decipher its ecological, environmental, and compliance requirements and develop innovative strategies to preserve native ecosystems and restore the rail line quickly. 

Key challenges

Order compliance: KiwiRail faced complexities regarding environmental and ecological management requirements under the Severe Weather Emergency Recovery Order

Environment and ecological management: Over 200 damaged sites required ecological assessments and tailored management plans to protect native biodiversity and ecosystems during design and construction. 

Contractor coordination: Multiple contractors and designers were involved in revitalising over 200 damaged sites. AECOM worked with all parties to deliver the environmental and ecological requirements under the Severe Weather Emergency Recovery Order.

Time constraints: The North Auckland Line is critical for regional freight, and recovery works must be completed as quickly as possible. Wildlife Act Authority Permits were also required to recover native lizards, creating further time pressures for the project.

A nature-positive outcome
AECOM conducted desktop and site assessments for each site to determine the ecological risks, undertaking baseline ecological surveys of streams, wetlands, and native vegetation to inform the development of ecological management plans. These plans included measures for protecting native lizards, fish, birds, bats, and vegetation during recovery operations. 

AECOM also inputted into design optioneering and coordinated contractors to implement the management plans effectively and ensure compliance with ecological standards during recovery efforts. This comprehensive approach minimised the environmental and ecological impacts while expediting the restoration of critical rail infrastructure.

AECOM’s tailored management plans to protect native biodiversity and ecosystems were implemented during design and construction and achieved many positive outcomes, including:

  • Relocation of 12 native skinks and geckos at damaged sites
  • Relocation of more than 200 native fish from waterways
  • Implementation of bat management protocols during vegetation removal after long-tailed bats were found to be active around several sites
  • Implementation of nesting bird checks and controls when they were discovered.