It looks like you're in . Would you like to see content relevant to your location?

You can change this anytime by selecting “Reset my location” in the footer.

Northwest Regional Water Treatment Plant Improvements

Ohio, United States

Filter projects by:

Market

  • Chemicals

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Decommissioning

  • District energy systems 

  • Education

    Colleges & Universities

    Schools

  • Energy

    Battery Energy Storage Systems

    Biomass

    Carbon capture utilization and storage

    EV charging

    Geothermal

    Heat pumps

    Hydrogen

    Hydropower

    Natural gas

    Nuclear

    Nuclear Energy

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transmission and distribution

    Transportation decarbonization

    Wind

  • Healthcare

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Buildings & Infrastructure

    Civil Works

    Disaster Resilience

    Energy

    Environment

    International Development

  • Oil and gas

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transit Bus and Bus Rapid Transit (BRT) 

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    High-speed rail 

    Highways & Roads

    Light Rail

    Mass Transit

    Ports and Maritime

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Advisory

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Resilience and Adaptation  

    Cultural Resources and Heritage Management 

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • Chinese Mainland

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

  • Zambia

For Greene County’s first-ever collaborative delivery project, we worked as part of an integrated team on the successful Northwest Regional Water Treatment Plant (NWRWTP) Improvements, using progressive design-build.

Greene County, located in southwestern Ohio, is home to about 168,000 residents. It features a blend of urban centers and rural landscapes, creating a diverse and close-knit community.

The County is recognized for its proactive approach to water quality, including the Greene Forward initiative, which aims to modernize water infrastructure and improve reliability for residents.

The public water supply in the county comes from an underground aquifer. As the water is pumped from beneath the ground, it passes through limestone, resulting in hard water with a high concentration of minerals — particularly calcium and magnesium. Since the existing water treatment facilities didn’t remove these minerals, residents were required to install expensive and difficult-to-maintain, in-home water softening systems.

The NRWTP Improvements marked a turning point for Greene County, making sure that water is not only reliable but also easier on homes, businesses and the environment.


Expanding water capacity and improving infrastructure 

This $45.6 million project expanded the County’s water system capacity from 10.5MGD to 12 MGD and provided the ability to expand capacity to 16 MGD in the future. Constructed at the site of the existing NWRWTP, this project included:

  • A new aerator and reaction tank as well as improvement to existing aerators, reaction tank and gravity filters
  • New gravity filters with new filtered water break tank
  • A new membrane-softening facility with integrated reverse-osmosis/nanofiltration (to achieve 8 grains per gallon hardness) and all supporting feed pumps, cartridge filters, membrane skids, cleaning equipment and chemical-feed systems
  • Relocating the existing chemical feed systems to a new membrane building
  • New clearwell mixing systems
  • Renovating the existing administration building and maintenance garage
  • A new standby generator and electrical service to site
  • A complete upgrade of the SCADA system

The benefits of the project include increased system capacity, improved water quality and customer cost savings. Transitioning the system to 12 MGD allows for regional growth in the service area and the 16 MGD footprint plans for future needs. The enhanced water quality has been reflected in the taste, clarity and odor, while customers are saving money through reducing home softening salt demands or even removing the need for water-softening system installations, maintenance and replacements.


Collaborative delivery in action

As the single largest investment in its history, Greene County contracted with AECOM, as part of a joint venture (JV) with Shook Construction, to deliver the NWRWTP Improvements project under a collaborative delivery approach.

True collaboration was necessary to ensure that:

  • The tight schedule could continue to move forward without being held up waiting for a decision to be made.
  • As many meetings as necessary were held, and open communication lines were kept between the JV team, the plant operation staff, and the owner and its consultant teams.
  • Both members of the JV could maintain constant communication.
  • Members from both JV companies were onsite daily and worked hand-in-hand to make sure all necessary submittals received approval in a timely manner and technical decisions could be made immediately.
  • The JV was allowed to direct their subcontractors without delay so their work could continue unimpeded.

Moreover, three major challenges arose during the project that were able to be resolved, due to the collaborative nature of the team and the use of progressive design-build.


Overcoming challenges through true teamwork

Meeting an expedited schedule

Because a compressed timeline was critical, the progressive design-build approach enabled the team to develop an enhanced scheduling concept to decrease general condition costs, strategically sequence construction activities to keep existing facilities operational and maintain water quality standards throughout the process. As a result, the team was able to construct the new facilities while maintaining an uninterrupted water service.

Adapting to supply chain disruptions

Delays caused by COVID-19 required us to identify critical equipment early and expedite procurement. We also leveraged the firms’ collective experience and project backlog to mitigate supply chain issues and work closely with the County to ensure quick approval of equipment orders. Through these collaborative efforts, the team was able to procure long lead–time equipment without falling behind on the construction schedule.

Overcoming commissioning hurdles

During commissioning, excess iron breakthrough in the filters affected membrane performance. Working as a cohesive team — designer, contractor and owner — we established system capacity using new facilities while minimizing reliance on existing filters, rehabilitated 12 filters with new media in just six months, and ultimately brought the new plant online quickly to deliver high-quality water to customers.


A lasting impact for Greene County

The Northwest Regional Water Treatment Plant Improvements project showcases the transformative potential of progressive design-build. Through a collaborative process uniting designers, contractors and the County, the project delivered a modernized water system designed to meet both current needs and future demands. Beyond construction, the improvements have strengthened Greene County’s water infrastructure, enhancing resilience, operational efficiency and sustainability. These advancements ensure reliable service and long-term benefits for the community, supporting both quality of life and economic growth.