It looks like you're in . Would you like to see content relevant to your location?

You can change this anytime by selecting “Reset my location” in the footer.

Parakiore Recreation and Sport Centre: A legacy of resilience and renewal

Christchurch, New Zealand | Aotearoa

Filter projects by:

Market

  • Chemicals

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Battery Energy Storage Systems

    Biomass

    Carbon capture utilization and storage

    EV charging

    Geothermal

    Heat pumps

    Hydrogen

    Hydropower

    Natural gas

    Nuclear Energy

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transmission and distribution

    Transportation decarbonization

    Wind

  • Healthcare

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Buildings & Infrastructure

    Civil Works

    Disaster Resilience

    Environment

    International Development

  • Oil and gas

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    Cultural Resources and Heritage Management 

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • Chinese Mainland

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

New Zealand’s largest aquatic and indoor recreation facility, Parakiore, is a cornerstone of post-earthquake regeneration in Christchurch. AECOM overcame complex challenges to assist with the delivery of this world-class venue, which embeds sustainability and cultural identity.

Delivering New Zealand’s largest aquatic and indoor recreation facility  

Parakiore Recreation and Sport Centre is more than a building — it’s a symbol of resilience and regeneration for Christchurch. Spanning 32,000 square metres, the facility features all under one roof:  

  • A 50-metre Olympic-standard competition pool
  • Toddler, leisure, spa and hydrotherapy pools
  • An elite dive pool
  • Hydroslides
  • A splash deck and water adventure playground
  • Multi-purpose courts
  • High-performance training areas

Designed for accessibility, inclusivity and cultural identity, Parakiore will serve both community and elite sport for decades to come.

  

Guiding a complex infrastructure project with Early Contractor Involvement  

We provided Project Management, Cost Management and Engineer to Contract services, steering the project through ground remediation, construction and pandemic disruptions.  

Contract administration: Collaboration and fairness  

Our team helped foster an environment which encouraged collaboration and transparent communication between contractual parties.  

Progress was achieved through on-site visibility, replacing rigid exchanges with collaborative problem-solving. The Engineer’s Representative with support from the Project Management team were pivotal in administering contractual obligations, working through competing interpretations of entitlement — while maintaining fairness throughout and with a focus on achieving the best project outcomes.  

This approach helped to resolve disputes, uphold safety standards and strengthen relationships.  

Cost management and commercial leadership  

Our Cost Management team played a critical role in navigating one of the most commercially complex projects in New Zealand. The team maintained financial accuracy and transparency by forecasting different contracting scenarios and verifying thousands of cost lines each month, keeping this complex project on track. This proactive approach, building robust data systems, analysing claims and strengthening positions, helped maintain confidence at every level. 

An accessible facility for everyone  

Parakiore is designed to touch every walk of life, from members of the public to Olympic champions. From hydroslides and sensory pools to elite dry-dive facilities, it offers experiences that are both fun and aspirational. For Christchurch, this is more than sport — it’s placemaking. It draws people back into the city, revitalising urban life and creating a hub for health and connection.  

Embedding sustainability and cultural identity  

Innovation didn’t stop at design. Parakiore features Australasia’s first building-scale Wastewater Heat Recovery system. The system captures thermal energy from wastewater. The wastewater is diverted through a pump station, macerator and heat exchanger to heat pools. The recovered wastewater energy can produce both chilled and heating water for pool and building operations. The system can offset 3MW of energy, reducing emissions and operating costs.   

The name Parakiore was gifted by Ngāi Tūāhuriri and carries deep cultural significance. It refers to athleticism and agility; qualities associated with a traditional warrior culture and reflects the spirit of strength and resilience that underpins this facility. Cultural motifs and narratives inspired by local stories are woven throughout the design, ensuring the centre is not only functional but also a celebration of identity and heritage.  

Delivering long-term community impact  

The journey to deliver Parakiore reflects the scale and ambition of this landmark project. Overcoming complex ground conditions, evolving stakeholder needs and global challenges such as the pandemic required resilience and collaboration at every stage.   

Today, Parakiore stands as a benchmark for innovation and partnership — a facility that will serve to empower high-performance sport at a local and national level, while providing a space for communities to thrive. For our team at AECOM, it represents the power of integrated delivery and the ability to shape lives through infrastructure.