Phoenix Sky Harbor International Airport Terminal 3 Modernization

Phoenix, Arizona, United States

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Alternative & Renewable Energies

    Emissions & Combustion Products Control

    Energy Efficiency

    Fossil Fuel Generation

    Gas Generation

    Hydroelectric Generation

    Siting and Permitting

    Transmission & Distribution

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    High Tech

    Industrial Real Estate, Logistics & Retail

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Energy

    Environment

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Aviation

    Bridges & Tunnels

    Connected and Automated Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

  • Water

    Coastal

    Dams, Hydropower & Levees

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Interior Architecture

    Strategy Plus

    Urbanism + Planning

  • Cities Solutions

  • Construction Management

  • Construction Management

    AECOM Hunt

    AECOM Tishman

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Technologies

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Russia

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

In a joint venture, AECOM Hunt is serving as design-builder for the Phoenix Sky Harbor International Airport Terminal 3 Modernization, which includes the renovation of the Terminal 3 facility, the north concourse, and the addition of a new south concourse.

The comprehensive, phased project comprises a number of facilities that support the overall operation of an aviation passenger terminal, such as:

  • Terminal Processor: the 340,864-square-foot terminal processor is a complete remodel and expansion of the facility, comprised of four levels including the mezzanine, passenger, service, and street levels.
  • South Concourse: the 284,995-square-foot south concourse is a new 15 gate concourse consisting of both a passenger level and an apron level for service and support functions. The South Concourse was designed as a linear facility attaching to the terminal processor on the south end of the existing bridge.
  • North Concourse: the existing 153,002-square-foot north concourse is undergoing a comprehensive renovation of the passenger and apron levels. This includes 10 gates, with an expansion at the mid-point to create a concessions node at the buildings center.
  • Consolidated Campus Building 1: the renovation of the 71,000-square-foot Terminal 3 requires the administrative spaces be relocated outside of the terminal. The consolidated campus building is a pre-engineered building with insulated metal panels and a 2,600-square-foot central plant housing two chillers. The interior of the building will be built to Class-B office standards.
  • Remote Makeup Facility: the new 22,000-square-foot remote makeup facility is a pre-engineered metal building with insulated metal panels and metal roof, housing three baggage claim devices and associated conveyors.