It looks like you're in . Would you like to see relevant content?

Strengthening community connections: Waitaki Bridges Replacement project 

New Zealand | Aotearoa

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Nuclear Energy

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Data Centers & Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment, Recovery and Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    Digital EHS/ESG Solutions

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Delivering infrastructure that keeps communities connected — now and into the future — takes more than engineering excellence. It takes trust, partnership and a shared commitment to outcomes.

That was the ethos behind the Waitaki Bridges Replacement project, led by NZ Transport Agency Waka Kotahi and supported by us as a delivery partner. Completed in 2014, this legacy project replaced two 132-year-old single-lane bridges on State Highway 82 (SH82) near Kurow with new, modern two-lane structures — strengthening one of the region’s most critical transport connections. 

While the bridges have long since opened to traffic, the project remains a standout example of what’s possible when Early Contractor Involvement (ECI), collaboration and community-centred delivery come together to deliver with certainty. 

A critical link: Reimagined for the future

State Highway 82 is more than just a road — it’s a lifeline for the communities of Kurow and the Hakataramea Valley. It offers a vital alternative to State Highway 1 in the event of closures or emergencies, and it connects residents to employment, education and essential services on both sides of the Waitaki River. 

The decision to replace the original bridges — built in 1881 — was about safety, resilience, and future-proofing. The new bridges were designed to withstand seismic events, support oversized vehicles and freight and provide dedicated pedestrian and cyclist paths to encourage active travel. 

ECI in action: Laying the groundwork for certainty 

NZTA’s use of  ECI proved pivotal to the project’s success. We were engaged early in the process, working alongside contractors and the client to co-design smart, practical and cost-effective solutions. 

This early collaboration enabled: 

  • Cost savings through optimised material usage and construction methods. 
  • Reduced risk thanks to proactive identification and mitigation strategies. 
  • Improved constructability with contractor insights informing the design. 
  • Greater transparency across pricing and procurement, building trust across the board. 

The result? A complex infrastructure upgrade delivered on time and within budget — with quality outcomes that stood the test of time. 

Putting people first 

The impact of the project was felt far beyond the worksite. 

Improved pedestrian and cycling facilities have made the bridges safer for everyone, while realigned approaches and upgraded intersections have improved travel efficiency. Importantly, the new bridges preserved — and strengthened — the longstanding social and economic ties between Kurow and the Hakataramea Valley. 

From the outset, stakeholder and community engagement was a central part of the project. Community workshops, regular updates and open days ensured local voices were heard and needs addressed — maintaining support throughout delivery.

Building with sustainability in mind 

Even in 2014, the project’s approach to sustainability set a benchmark. 

Through the ECI process, the team introduced lightweight materials to reduce seismic loads and craneage requirements, cutting construction emissions and improving safety. Wherever possible, design decisions were made with durability, lifecycle costs and environmental impact front of mind — delivering long-term value for NZTA and the communities they serve. 

A bridge to better outcomes 

We are proud to have supported NZTA in achieving a vision of safer, more resilient, and more connected infrastructure for the region. 

More than a decade on, the bridges continue to carry the people, freight and stories of the Waitaki Valley — a lasting legacy of what strong partnerships, early collaboration and a focus on community outcomes can deliver. 

Completed SH82 Waitaki River Bridges where Early Contractor Involvement was used to identify risks and face them head on. Image credit: Roadlab Limited.