Thomson East Coast Line Stage 3 Opens

Singapore

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Environment

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

AECOM provided Land Transport Authority (LTA) of Singapore with consultancy services for the detailed design and construction support of the Thomson East Coast Line Stage 3 (TEL3) which was officially opened on November 11, 2022.

Fully commencing on November 13, 2022, the project means that more than 180,000 households are now within a 10-minute walk from an existing TEL station. It also reduces commuters’ travel time between Northern Singapore to the city center by around 40 percent and lightens the load on existing rail lines and bus services.

AECOM was appointed to provide consultancy services delivering detailed design and construction supports for the Package C of the TEL under the ‘C2104’ contract. The contract included a route length of a 6-kilometer-long bored tunnel and five underground stations including two interchanges station threading through a high-end residential area to Singapore’s main shopping belt at Orchard, starting from Stevens, through Orchard Boulevard, Orchard, Great World City and ending at Havelock station.

We worked with the client to overcome engineering challenges posed by the site during the design and construction stage, one of which required performing “undercrossing”, a technique used for the first time by the LTA.

AECOM also provided detailed design and construction support for mechanical & electrical services for 11 stations across from Steven Station to Marina Bay (with the exception of Napier Station) under the ‘C2107’ contract. This scope covered Alteration & Addition works to the existing services at four existing interchange stations – Outram Park station, Orchard Station, Steven Station and Marina Bay Station – to integrate TEL3 with those interchanges. Our responsibilities included the environment control system, fire protection system, electrical services, authority and agency statutory compliance, and submissions under the appointed Qualified Persons for mechanical & electrical services.

Our multi-disciplinary team provided civil and structural, architectural, geotechnical, plumbing and sanitary services. We were also involved in the completion of the environmental impact assessment, traffic impact assessment, utilities diversions, reinstatement works, CSD/SEM production and construction support throughout the contract. We also appointed the Qualified Persons for Civil and Geotechnical engineering, responsible for the authorities’ and agencies’ statutory compliance and submissions.

Other underground works we conducted included pipe roofing, sinking shaft construction, and tunneling and underpinning below residential houses and a 9-story high-rise building.

About Thomson-East Coast Line

Thomson-East Coast Line (TEL) is a 43-kilometer fully underground train line that brings faster access to the city, the Central Business District (CBD), and developments in the Marina Bay area for Singapore residents in the east and along the North-South Corridor. It is the sixth MRT line and comprises 32 stations and eight interchange stations. The entire TEL is expected to be fully open by 2025.