Tunneling towards Tomorrow: Tseung Kwan O–Lam Tin Tunnel

Hong Kong

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Environment

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Discover the transformative Tseung Kwan O–Lam Tin Tunnel, enhancing connectivity and reducing travel time.

The Tseung Kwan O-Lam Tin Tunnel (TKO-LTT) is a milestone infrastructure project featuring a dual two-lane carriageway that spans 3.8 km in length, including a 2.2 km main tunnel and a branch tunnel connecting to the Eastern Harbour Crossing. The tunnel has greatly alleviated traffic congestion and reduced journey times by 20 minutes during peak hours. It also creates an opportunity for waiving the toll of the TKO Tunnel.

AECOM was appointed to conduct the investigation study, design, and construction of TKO-LTT.

People-based engagement strategy that emphasized social and environmental sustainability

We alleviated public concerns by proposing a straight tunnel design without a toll plaza which reduced reclamation works by 75% and preserved 1.2 km of natural shoreline. Considering local residents and the integrity of the nearby Cha Kwo Ling Village, we designed the Lam Tin Interchange’s main carriageway to be constructed below ground level. This strategic placement, combined with a landscaped deck and noise barriers, significantly mitigates environmental and visual disturbances.

Our approach to water conservation was equally innovative where we adopted a hybrid reclamation method for the construction of the underpass Road P2. TKO-LTT was the first project to adopt a temporary steel cofferdam and a double water gate system for reclamation works in order to minimize sediment flow to the open sea.

Temporary double water gate system

Innovative engineering: Multi-level design and pioneering tunnel bifurcation

Bifurcation tunnel section

At the Lam Tin Interchange, the interchange comprises of multilevel superstructures to provide the designated routes that required well planned construction sequence and logistic in a compacted ex-quarry site.

A significant achievement was the tunnelling of a branch tunnel with tunnel bifurcation – the first time for a road tunnel in Hong Kong – using drill and blast method. It reduced excavation material, while excavated marine sediment has been treated and re-used for backfill. The 38 m excavation span at the turnout presented a major tunnelling challenge, as was ensuring fire safety for the branch tunnel. Yet, the Fire Services Installations Acceptance Inspection for the road tunnel was completed in only 6 weeks compared to 3-4 months normally.

Due to space constraints, ventilation of the branch tunnel had to rely on the Western Ventilation Building at the Lam Tin Interchange. A ventilation adit, built by connecting the main and branch tunnels close to the portals, was designed with a 45-degree inclination to reduce pressure loss – more efficient than the conventional approach and making the ventilation system more energy efficient.

First road tunnel with a ventilation building partly nestled in a cavern

TKO-LTT also pioneered the construction of a ventilation building in a cavern for a road tunnel. This allows for underground placement of the majority of fan and plant rooms, resulting in a smaller footprint and significantly reducing excavation and soil nail requirements at the steep terrain of the TKO portal. The smaller slope cutting area has also helped to preserve valuable green belt habitat.

Overcoming construction challenges, such as controlled blasting near MTR lines as close as 12 m and open blasting at higher ground overlooking the MTR ventilation building, state-of-the-art blast design and technology was used to control ground vibration and monitor the impact, while a mini roof-over system prevented flyrock.

Semi-cavern ventilation building

Upon the gradual completion of new developments at Tseung Kwan O new town, the completion of TKO-LTT and Cross Bay Link have improved the transport network and facilitated the commuting public.

Awards and recognition for TKO-LTT

  • HKIE Grand Award 2024 – Grand Prize (Infrastructure category)
  • ACEHK Annual Awards 2023 – Annual Award
  • HKIE Geotechnical Project Excellence Award 2023 – Merit Award
  • NCE Tunnelling Awards 2020 – Environment and Sustainability Initiative of the Year