West Gate Tunnel Project

Melbourn, Victoria, Australia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

The $6.7 billion West Gate Tunnel Project will change the way people move around Melbourne and how trucks get to the port. It will give Melbourne a much-needed major second river crossing and provide an alternative route from the West Gate Freeway to the CBD. The project will slash congestion and travel times, take trucks off residential roads in the inner west and create 6,000 jobs.

The project will include:

West Gate Freeway: upgrading and widening the freeway from 8 to 12 lanes. New express lanes between the M80 and the West Gate Bridge will reduce weaving and merging that currently leads to traffic congestion.

A new tunnel from the West Gate Freeway to the Maribyrnong River will take motorists and trucks underground and off residential streets. The biggest tunnel boring machines in the southern hemisphere will be used for this tunnel.

Port to city: a new bridge over the Maribyrnong River and an elevated road along Footscray Road will provide direct links to the Port of Melbourne, CityLink and an extended Wurundjeri Way.
AECOM was engaged by Transurban as Technical Advisor and Environmental Planning and Approvals Advisor to assist in the Project Development phase and at each stage of the market-led proposal. This has involved:

Stage One: Preliminary assessment of ideas and proposals.

  • Providing planning and design advice to assist in the development of the market-led proposal.

Stage Two: Strategic assessment and recommendation.

  • Design options development and multi criteria assessment.
  • Planning and strategic assessment advice to inform the proposed planning process.

Stage Three: Detailed due diligence, investment case and procurement advice.

  • Development of the Concept Design.
  • Inputs into the investment case and traffic modelling.
  • Freight and logistics advice.
  • Community engagement.

Stage Four: Negotiation and assessment of final offer.

Assisted Transurban in engaging with key stakeholders including the Port of Melbourne, local councils, utility asset owners, accredited rail operators and planning authorities.

Inputs into the project scope agreement requirements with the Victorian Government and Transurban, establishing connections, ramp locations, portal locations and land constraints.

  • Assisted with development of the Reference Design. The scope of this work included:
    • Road alignment
    • Bridge general arrangements
    • Tunnel space-proofing
    • Noise modelling
    • Flood modelling and portal flood immunity advice
    • Fire and life safety advice.
  • Preparation of tender documentation.
  • Participation in Interactive Tender Workshops with each of the Shortlisted Respondents (tenderers).
  • Facilitated meetings between stakeholders and shortlisted respondents.
  • Preparation of the Impact Assessments and supporting the Victorian Government’s preparation of the Environment Effects Statement for the Reference Design.

Stage Five: Award contract.

  • Assisted the evaluation of the three tender submissions, with Financial Close occurring in December 2017.

Construction commenced on the West Gate Tunnel Project in January 2018 and the tunnel will be open to traffic in 2022.