Surrey Schools Programme

Surrey, United Kingdom

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

As the UK education landscape changes, fresh thinking is being sought to meet the ever-rising demand for places and to manage school estates. As ever, budgets are at the heart of this — even though local authorities still receive some funding directly from central government, the rise of academy status schools, which is creating more independence from local authorities, means local authority estates teams need to be leaner but still make informed decisions on where and how to spend the money.

One of our first steps was to introduce a project management framework flexible enough for any size of project and which sets out the key milestones with gateways at each stage. Gateway meetings are run to enable the programme team to check that the design is based on the agreed standard and that there is no scope creep or additional area above that required for the increase in pupil numbers. The most important area is deciding which schools are chosen for the expansion. The approach taken is a balanced scorecard with weightings applied to each stakeholder’s view to try to reach a consensus.

A Programme Execution Plan (PrEP) was developed and the project management team was inducted to it in a half-day workshop to ensure a consistent approach to all work. Each project manager (PM) had his or her own way of working, so by setting out how projects and the programme were to be managed has meant there is less duplication, rework and reduced margin for error.

In addition to the PrEP, a series of workshops was introduced to increase the knowledge base of the PMs, and ensure that all staff were clear on the processes and parameters within which they could work. These also included sessions on the governance structure of the programme, budgeting, including the Medium Term Financial Plan (MTFP) and statutory processes of the county council.

The cost management of the programme was reviewed, and information provided by project quantity surveyors was challenged and checked. Adopting a consistent format enabled benchmarking, cost reduction and setting targets for cost per square metre.

Most of the Surrey schemes involve increasing numbers of pupils at existing schools on tight urban sites and this creates unique challenges. Much of the work on standardisation that has taken place nationally is for whole new-build schools, so we worked with the council and other partners to develop a Surrey baseline specification for 1FE (form of entry) extensions that sets out acceptable standards.

With the success of the schools programme we are now starting to help Surrey to review its non-schools programme; adapting the schools approach and aligning management across the council’s property service.

“Transforming the management of our expansion programme — with quick access to the status of our projects — has meant we can focus on the risks and issues, with time and confidence on our side.” John Stebbings, Chief Property Officer, Surrey County Council”