Halley VI Research Station

Brunt Ice Shelf, Antarctica

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Environment

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges & Tunnels

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

    Transportation decarbonization

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

The Halley VI Research Station is one of the most challenging and technically complex buildings ever delivered, in the harshest climate on earth. The world’s first fully relocatable, permanently manned Antarctic research station, it redefines polar architecture and engineering.

The British Antarctic Survey (BAS) had an ambitious scientific goal to carry out pioneering research in space weather (changing environmental conditions in near-Earth space), near space atmosphere and climate change, in an extreme environment where snow levels change and the ice pack shifts.

The Halley VI research area is the southernmost Antarctic station operated by BAS and is located on the 150-meter-thick (492-feet-thick) Brunt Ice Shelf, which flows out to sea at an annual rate of 400 meters (1,312 feet). Snow levels on the ice shelf rise by around one meter every year with temperatures dropping to -56° Celsius (-69° Fahrenheit). Design principles centered around survivability, maintainability and livability, allowing the station to function reliably and economically as a home for dozens of scientists who will be living there for up to 18 months at a time.

Some of the immense technical challenges involved required considerations of logistics, extreme cold, wind and snow environments, snow accumulation, moving ice, narrow construction windows, environmental protocols and tight financial constraints.

David Willetts, U.K. minister for universities and science, hailed it as “a triumph of British design, innovation and engineering,” and Michael Pinnock, board member, science delivery, BAS, regarded the project as “a major step forward in the evolution of British polar stations and the culmination of a truly collaborative approach.”

Halley VI’s success can be attributed to an intimate collaborative process among AECOM, BAS, Hugh Broughton Architects and contractor Galliford Try. AECOM responded to BAS’s design brief by producing a compelling concept design for a sustainable research station that offered ease of delivery, construction, operation and decommissioning.

According to Michael Wright, a regional director with AECOM’s building engineering team: “The design’s success also rests on a “comprehensive understanding of the station’s scientific mission, and the extreme conditions affecting the base and the scientists who call it home.”

Wright, who worked on the project from its inception with AECOM’s design partner Hugh Broughton Architects, explains: “From the outset we agreed that this was first and foremost an engineering project and we’d need to come up with something that no one else had ever done.”

The end result was the competition-winning modular design concept with a station sitting on giant ski-based foundations that provide secure footing and a mode of relocation. Its hydraulic legs allow the base to mechanically “climb” out of the snow. As the ice shelf moves out towards the ocean, the modules can be lowered onto the skis using the hydraulics and towed by bulldozers to a new, safer location farther inland.

One of the major aims of the Halley VI project was to minimize the environmental footprint of the station. The facility uses the latest energy-saving technology, including bioreactors for sewage treatment and two-stage incinerators for the clean burning of certain types of waste. Translucent nanoaerogel panels, the most thermally efficient material known, were incorporated and substantially reduce energy loss in the extreme, harsh climate.

The successful delivery of Halley VI was a fantastic example of design, innovation, construction and procurement at its best, requiring an intimate collaborative process between client, design team, main contractor and supply chain. The design and construction included unique technology transfers from other industries, and a range of totally original inventions.

Awards

  • ENR (Engineering News-Record) Excellence Awards 2014 – Overall Global Project of the year
  • Architizer A Awards 2014 – Jury and Popular vote winner – Higher Education Institutions & Research Facilities
  • Civic Trust Award 2014
  • Civic Trust Special Award for Sustainability 2014
  • Structural Awards 2013 Award for Sustainability
  • BCI (British Construction Industry) Award 2013, International Project of the Year
  • RIBA International Award 2013
  • AIA (The American Institute of Architects) U.K. Chapter Excellence in Design 2013