Jurong Lake Garden Phase 2 Development

Singapore

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Carbon capture, utilization and storage

    Geothermal

    Grid modernization

    Hydroelectricity

    Hydrogen

    Microgrids and energy storage

    Offshore wind

    Portfolio Decarbonization and Climate Resilience

    Solar

    Transportation decarbonization

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    Digital Infrastructure

    High Performance Logistics

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Environment

    Infrastructure & Facilities

    International Development

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Air Cargo

    Aviation

    Bridges

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Light Rail

    Mass Transit

    Ports & Marine

    Transportation decarbonization

    Tunnels

  • Water

    Dams & Hydropower

    Flood and coastal resilience

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Climate Adaptation

    Community Engagement

    Interior Architecture

    Landscape Architecture

    Planning

    Urban Analytics

    Urban Design

    Urbanism + Planning

  • Asset Management

  • Cities Solutions

  • Construction Management

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental and Social Impact Assessment and Permitting

    Environmental Contracting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Finance

  • Industrial and Commercial Operations and Maintenance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Development & Implementation

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Strategic consulting

    People + Place Advisory

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Bangladesh

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Eritrea

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Mongolia

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand | Aotearoa

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

Jurong Lake Gardens Phase 2 Development has received the prestigious Platinum Super Low Energy (SLE) Rating under Green Mark 2021 (GM:2021) by the Building & Construction Authority (BCA). This makes it the first project of AECOM and the National Parks Board (NParks) to be given this honor.

Designed as a people’s garden, this project aims to bring together families and communities on a landscaped space that promotes sustainability and a healthy lifestyle. Our team has helped our client, NParks, to deliver this project, having provided M&E, C&S, QS and sustainability services, together with partners Liu & Wo Pte Ltd (architect) and SALD Pte Ltd & Landscape Design (landscaping).

Given its commitment to sustainability and overall well-being, the project has also gained the Health & Well-Being (Hw), Resilience (Re) and Whole Life Carbon (Cn) badge to the Platinum SLE rating accolades.

Key Project Team

OwnerNational Parks Board [NPB]
ArchitectLiu & Wo Architects Pte Ltd [L&W]
C&S, ESD, M&E and QSAECOM Singapore Pte Ltd [AECOM]
LandscapeSALD Pte Ltd and Landscape Design
ContractorKuan Aik Hong Construction Pte Ltd [KAH]

Health & Well-Being (Hw)

Jurong Lake Gardens Phase 2 Development will achieve Universal Mark Design Gold and is home to a plethora of facilities for people of all ages to enjoy. The facilities include the largest outdoor skatepark in Singapore at 17,000 m2 that is inclusive of five skate pods, a 300 m2 parkour park and a 3 m bouldering wall. Food and beverage (F&B) outlets are certified under the Health Promotion Board (HPB) Healthier Dining Programme to offer healthy food and drink options, with drinking fountains installed at all buildings within the development. Designated shared pedestrian and cycling footpaths forms part of the Coast 2 Coast Cycling trail with separation for vehicular access. Bicycle lots, lockers and shower facilities can be found within the development to encourage an active and healthy lifestyle.

Resilience (Re)

The development comprises of buildings nested within a park. A biodiversity impact assessment was conducted to minimize the construction impact to the existing biodiversity within the development. The development has achieved a Green Plot Ratio (GnPR) of 7.94 while promoting the inclusion of 51.72 percent of landscaping being of native origin. In order to minimize the disruption to site, careful planning was made in efforts to conduct a feasibility study of tree-transplanting by certified arborists wherever possible. The development also boasts a strategy comprising of a combination of bio-retention basin and rain gardens that would be able to treat approximately 20 percent of surface water run off over the entire area, attaining Active, Beautiful and Clean Waters (ABC) Waters Certified in the process. The Singapore 30 By 30 Plan is actively seen within the gardens encouraging the F&B outlets to use local produce and demonstrating a farm to fork concept. Leaf litter is reused as much as possible for trees and plants while food waste from tenanted spaces is collected by BNL for processing in the North Bin center compactor.

Whole Life Carbon (Cn)

Jurong Lake Gardens Phase 2 Development has a relatively low Concrete Utilization Index (CUI) of 0.258 compared to the reference value of 0.35, saving up to approximately 26.28 percent of concrete use. The low CUI was only made possible through the selection of mass engineered timber (MET) as the main building blocks of six buildings within the development. MET can be classified in two broad categories — cross laminated timber (CLT) and glulam laminated timber (GLT). Venturer Timberwork who was the MET supplier provided an open link of the project supply chain allowing for the tracking of the embodied carbon emission of the building elements.

The combination of better material selection eventually culminated to the project achieving a 55.48 percent reduction in embodied carbon emissions compared to the reference baseline of 1,000kgCO2e/m2. MET is the only building material that contributes biogenic emissions which is at -119.76 kgCO2e/m2.

Pan’s United Carbon Cure Concrete was extensively used for the development of the footpath while NEWSand was test bedded as an additive.

Jurong Lake Gardens Phase 2 Development also strives to reduce the operational carbon emission (referred to Stage B6) by installing an 82.5 kWp PV System accounting for 102.96 MWh/yr of electricity reduction.

This unique development showcases how sustainability can be achieved in the city, and how this can tie-in with efforts to promote a healthier lifestyle. We congratulate the team who helped turn this vision into a reality and we hope more Platinum SLE, ZE or even PE developments are on the way to help Singapore grow into a greener and more resilient city for generations to come.