Soekarno-Hatta International Airport Express Rail Link – Pre-Feasibility Study

Jakarta, Indonesia

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Alternative & Renewable Energies

    Emissions & Combustion Products Control

    Energy Efficiency

    Fossil Fuel Generation

    Gas Generation

    Hydroelectric Generation

    Nuclear Generation

    Siting and Permitting

    Transmission & Distribution

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    High Tech

    Industrial Real Estate, Logistics & Retail

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Energy

    Environment

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Aviation

    Bridges & Tunnels

    Connected and Automated Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

  • Water

    Coastal

    Dams, Hydropower & Levees

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Interior Architecture

    Strategy Plus

    Urbanism + Planning

  • Cities Solutions

  • Construction Management

  • Construction Management

    AECOM Hunt

    AECOM Tishman

  • Converged Resilience

  • Cost Management

  • Decommissioning and Closure

  • Digital Infrastructure Services

  • Economics

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • IT and Cybersecurity

    i3 by AECOM

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Technologies

  • Program and Project Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Afghanistan

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Russia

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

To provide a faster access between Soekarno-Hatta International Airport (SHIA) and Jakarta downtown, AECOM provided pre-feasibility studies for SHIA Rail Link Public-Private Partnership (PPP) project.

Soekarno-Hatta International Airport (SHIA) is the main aviation hub for visitors going in and out of Jakarta, Indonesia. It is now one of the world’s busiest airports, handling over 50 million passengers annually.

To serve this increasing volume of air passengers, the Indonesian government initiated the study for an express rail link, connecting SHIA to the Jakarta city centre. The Client, PT Sarana Multia Infrastructur (PT SMI) is an agency under the Ministry of Finance, which administers  public-private partnership (PPP) projects in Indonesia. AECOM led a consortium and won the bid in 2012 to undertake the pre-feasibility study for the SHIA Rxpress Rail Link.

The proposed alignment consists of a dedicated rail track of approximately 35 kilometers long, connecting SHIA (northwest of Jakarta) with the existing domestic Airport at Halim (Southeast of Jakarta),  and passing through four existing, mass rapid transit stations in the city, including Pluit Station, Tanah Abang Station, Dukuh Atas Station, Manggarai Station. The proposed alignment will be elevated above ground, with journey time between SHIA and Halim expected to take lesser than 25 minutes.
Services

• Identify different options for the  route alignments, and selection of a preferred alignment, including station locations;
• Technical scope included: compilation of statement of needs, functional specifications for the railway system, basic designs of the civil works. It also involved the study of constructability and operational feasibility;
• Demand and revenue forecasts, including fare optimization;
• Economic and social cost benefit analysis (ESCBA), project financial model, market and risk analysis; viability gapping fund (VGF);
• Environmental impact assessment (EIA) and safeguard studies, including land acquisition and resettlement;
• Legal and statutory framework of the PPP procedures.